Case Study: Life and Death of an Aircraft Development Project

Law and Callon described the history of a large British aerospace project in terms of two entities: the global system and the project itself. The global system comprised parties and organizations outside the project that had a stake in the project; the project comprised everything within the project including all work and the organizations contracted to do it.

THE GLOBAL SYSTEM

The principal stakeholders in the global system were: 1. The Royal Air Force (RAF), which initiated the project with a request for a new supersonic aircraft with short take-off capability. The aircraft would be a "tactical strike and reconnaissance fighter" called TSR. 2. The Ministry of Defence (MOD), which wanted an aircraft that would best fit the nation's current overall defense needs. 3. The Treasury, which wanted an inexpensive aircraft that would have market appeal for sale outside the UK, such as to the Royal Australian Air Force (RAAF). 4. The Royal Navy (RN), which wanted to buy a different aircraft but was under pressure by MOD to buy the TSR. 5. The Ministry of Supply (MOS), which wanted an aircraft that would be produced by a consortium of several UK airframe and engine manufacturers. As is typical of most projects, each stakeholder in the global system conceptualized the project differently: to the RAF and MOD it would yield an aircraft for a specific mission; to the Treasury it would fit the defense budget and generate revenue; to the RN it was a competitive threat to the aircraft they really wanted; and to the MOS it was an instrument of industrial policy. The parties had different reasons for contributing resources and support: some were economic (in return for funds, an aircraft would be built); some political (in return for a demonstrated need, objections of the RN would be overruled); some technical (in return for engineering and technical effort, the aircraft would meet RAF performance requirements); and some industrial (in exchange for contracts, the aircraft industry would be consolidated).

THE PROJECT

The Treasury would not approve project funding until the aircraft's basic design, manufacturer, cost, and delivery date were defined. The RAF and MOD sent requests to the aircraft industry for design ideas, and selected two manufacturers: Vickers Corp. and English Electric (EE). They favored Vickers for its integration capability (combining aircraft, engine, armaments, and support equipment into a single weapons package), but they also liked EE for its design experience with supersonic aircraft. So they decided to contract with both companies and adopt a design that would utilize features from both. The idea was approved by all other parties in the global system, and funding for the project was released. The project grew as Vickers and EE hired subcontractors and expanded their teams for design, production, and management. The two companies and several other contractors merged to form a single new organization called the British Aircraft Corporation (BAC).

RELATIONSHIPS BETWEEN THE GLOBAL SYSTEM AND THE PROJECT

As the project grew, so did the problems between it and the global system. The MOS wanted centralized control over all aspects of the project, and all transactions between the project and stakeholders in the global system. Although BAC was the prime contractor and ostensibly responsible for managing the project, the MOS would not confer upon it the necessary management authority. Rather, the MOS formed a series of committees with members from the global system and gave them primary responsibility to manage the project. This led to serious problems: 1. The committees were allowed to make or veto important project-related decisions. They, not BAC, awarded important contracts; when the RAF wanted to change its requirements, it consulted with the committees, not with BAC. 2. The committees often lacked sufficient information or knowledge. Technical committees made decisions without regard to costs; cost committees made decisions without regard to technical realities. Decisions focused on particular aspects of the project; seldom did they account for impacts on other parts of the project, or the project as a whole. Distrust grew between BAC and the MOS; neither was able to effectively integrate the resources, information, and decisions flowing between parties in the project and the global system. Subcontractors became difficult to control. Many ignored BAC and worked only with the MOS and RAF to get favorable treatment.

GLOBAL SYSTEM RESHAPED

Everyone knew the project was in trouble. Project costs doubled. One of the test engines exploded, and the RAF recognized it might take years to understand the cause. In addition, the RAAF announced that it would not order the TSR but was instead buying the US-built F-111. Opposition to the project grew, and in the upcoming general election the Labour Party promised that if elected it would review the project. When the Labour Party won, it immediately began an assessment of the project, which included comparing the TSR to the F-111-considered by now an alternative to the TSR. As cost overruns and schedule delays continued, the MOS slowly withdrew support. The RAF then withdrew its support, when it discovered that the F-111, which was already in production, would meet all of its requirements. The project was canceled.

Questions: 1. In this case history, what is the "system" and what are its elements? What is the "environment," and what are the elements of the environment?

2. Describe the interaction between the system and its environment.

3. Do you feel that important decisions made in this project represent "system thinking"? Explain.

4. Comment on the concept of "integration" in the project. How were aspects of the project integrated or not integrated?

5. What are the main factors that contributed to cancellation of the project? Which of these factors would you characterize as project management?

Reference no: EM131844113

Questions Cloud

True about profits from futures contracts : Which of the following is true about profits from futures contracts?
What are the strengths and weaknesses of the board members : What are the strengths and weaknesses of these board members, including potential gaps in their knowledge? Do you see any ways in which their advice.
Are call loans or demand loans considered rate-sensitive : Are Call loans or Demand Loans considered rate-sensitive?
Disloyalty is serious unethical and often illegal activity : Loyalty is a highly desirable ethical value, and disloyalty is a serious unethical and often illegal activity.
Describe interaction between the system and its environment : In this case history, what is the "system" and what are its elements? What is the "environment," and what are the elements of the environment?
Estimate of the maximum share price for the purchase : What is your new estimate of the maximum share price for the purchase? What is the maximum share price that Happy Times should be willing to pay for Joe’s?
What will the bond price be in one year : A 6.6% coupon, 9-year annual bond has a yield to maturity of 5.8%. What will the bond price be in one year? What is the capital gains yield for this bond?
Had the elements for adverse possession been met : Witt v. Miller, and answer the question about the case. Edward and Mary Shaughnessey purchased a 16-acre tract in St. Louis county in 1954.
What is the price of par value semi-annual bond : What is the price of a $1,000 par value semi-annual bond with 24 years to maturity and a coupon rate of 10.8% and a yield-to-maturity of 9.9%?

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd