Unit 11 Measurement & Estimating

Unit code - A/615/1397
Credit value - 15

Learning Outcome 1: Define standard measurement techniques used for taking-off quantities for estimating purposes

Learning Outcome 2: Perform taking-off techniques in the production of a range of quantities for a structure

Learning Outcome 3: Interpret the principles and techniques of estimating in compiling a final price

Learning Outcome 4: Prepare an estimate for a work activity.

Taking-off:

Substructure elements, foundations: mass fill, pad and raft, excavation works, filling, ground floors, drainage, manholes, service installations, road kerbs, channels and foundations, road surfacing, external works

Superstructure elements, walls, intermediate floors, roof structures and coverings, in situ concrete works, masonry, steel framed commercial structures, pre-cast concrete frames, building services, mechanical and electrical installations.

Application:
To construction projects (simple work sections, trade sections), use of annual techniques, use of software for taking-off dimensions, use of digitisers to take dimensions from drawings, integration packages using CAD, and estimating.

LO3 Interpret the principles and techniques of estimating in compiling a final price
Collection of data:
Characteristics, labour, labour costs, plant rates data, company data on output
levels, cost of materials, terms of supply, delivery costs, handling, wastage, conversion.
Processes and procedures for estimate:
Factors affecting prime costs, method statements (effect on estimating), use of standard reference documents, coverage rules for units of work, e.g. Standard
Method of Measurement (SMM) 7, New Rules of Measurement (NRM), Civil Engineering Standard Method of Measurement (CESMM), and any other
measurement rules used in the specific form of locale measurement rules.
Calculation of unit rates in building up an estimate:
Labour, plant and materials, overheads and margin, outputs: recorded historically, price books, assimilated, LOSC Labour only sub-contractor (LOSC) rates, governed by plant outputs and capacities
Plant: purchase or hire options
Materials: wastage, purchase price, delivery costs. Adjustments to unit rates in building up an estimate:
Historical rates adjusted for time, inflation, risk, technology, alternative plant, location, price increases.

LO1 Define standard measurement techniques used for taking-off quantities for estimating purposes

Techniques for quantifying budgets:
Preliminary, intermediate and final estimates for clients budgets, Project Comparison Estimating using historical project cost data, use of Building Cost Information Service (BCIS), square meter and cubic meter estimates, elemental estimating, approximate quantities techniques, measurement using dimension paper, measurement using software packages.
Standard methods of measurement for taking-off quantities:
For construction, civil engineering and building services engineering, format, coding schemes, measurement rules, dimension sheets
Standard Method of Measurement 7, New Rules of Measurement, NRM 1 Order of cost estimating and elemental cost planning, MRM 2 Detailed measurement for building works, NRM 3 Order of cost estimating and cost planning for building maintenance works, Civil Engineering Standard Method of Measurement 4 (CESMM4), FIDIC contracts for use in international organisations.
Uses:
Project stages, clients budget, preliminary stages, project comparison stages, final design stage, preparation of bills of quantities for the tendering for work, sub-contract and supply chain packages, final account, maintenance and refurbishment works.

LO2 Perform taking-off techniques in the production of a range of quantities for a structure
Measurement techniques and processes:
Techniques e.g. traditional (using dimension paper), abstraction of quantities,
associated working up processes and preparation of bill of quantities pages, computer aided systems, use of digitisers.

Taking-off:
Substructure elements, foundations: mass fill, pad and raft, excavation works,
filling, ground floors, drainage, manholes, service installations, road kerbs, channels and foundations, road surfacing, external works
Superstructure elements, walls, intermediate floors, roof structures and coverings, in situ concrete works, masonry, steel framed commercial structures, pre-cast concrete frames, building services, mechanical and electrical installations.

Application:
To construction projects (simple work sections, trade sections), use of annual techniques, use of software for taking-off dimensions, use of digitisers to take dimensions from drawings, integration packages using CAD, and estimating.

LO3 Interpret the principles and techniques of estimating in compiling a final price
Collection of data:
Characteristics, labour, labour costs, plant rates data, company data on output
levels, cost of materials, terms of supply, delivery costs, handling, wastage, conversion.
Processes and procedures for estimate:
Factors affecting prime costs, method statements (effect on estimating), use of standard reference documents, coverage rules for units of work, e.g. Standard
Method of Measurement (SMM) 7, New Rules of Measurement (NRM), Civil Engineering Standard Method of Measurement (CESMM), and any other
measurement rules used in the specific form of locale measurement rules.
Calculation of unit rates in building up an estimate:
Labour, plant and materials, overheads and margin, outputs: recorded historically, price books, assimilated, LOSC Labour only sub-contractor (LOSC) rates, governed by plant outputs and capacities
Plant: purchase or hire options
Materials: wastage, purchase price, delivery costs. Adjustments to unit rates in building up an estimate:
Historical rates adjusted for time, inflation, risk, technology, alternative plant, location, price increases.

LO4 Prepare an estimate for a work activity Estimating techniques for budgeting purposes:
Preparation of approximate quantities for cost budgets, elemental cost estimating from given historical cost data, use of preliminary design drawings, preparation of estimate using BCIS comparative cost data, any other forms of local cost data, adjustments for time, size and quality, inflation and overheads.

Estimating techniques:
Application of all in rates to quantities, total net value, overheads and profit, preliminary items, VAT, pricing in risk, factors affecting risk, inclusion of sub-contracted elements, effect of location, contract period, inclusion of provisional items, use of standard templates and forms, use of ISO 9000 company devised systems.

Application:
Estimation of a work package or activity costs from given data in compiling a final estimate for submission to a client as part of a tendering process.

Reference no: EM133268840

Questions Cloud

Patient protection and affordable care act of 2010 : Using your own words, Examine how the Patient Protection and Affordable Care Act of 2010 has impacted health plans in terms of quality, cost, and access.
What is lowes doing well in : How does lowes match up to the rival home improvement stores such as home depot and menards?
What nutrition-related concerns are suggested by judi : Using the BMI table in the back of the book, check the ideal weight range for a person of Judi's height. What nutrition-related concerns are suggested by Judi
What is tatiana lacking from her diet : What is Tatiana lacking from her diet that can increase the risk of cancer development? Explain how these deficiencies exert their effects
Define standard measurement techniques used for taking-off : Unit 11 Measurement and Estimating - Define standard measurement techniques used for taking-off quantities for estimating purposes
How does conditions on service approval : How does Conditions on service approval (safety, health, and wellbeing of children and Health, hygiene, and safe food practices relate together with the Learnin
How much does one month supply cost : Is there scientific support for its use; does is actually work? How much does 1 month's supply cost? Where can you buy it
Explain the arguments for and against the casino : Explain the arguments for and against the casino industry in the Caribbean in three (3) paragraphs.
Design and quantity of performance : What are the differences between the dimensions of quality of design and quantity of performance?

Reviews

len3268840

11/8/2022 10:31:17 PM

I have an assignment due that contains this criteria however there is more to it. Im happy for just the pass criteria of all LO''s to be completed. Regarding pages I''m happy for as many as needed would you be able to give me a rough estimate and we can discuss from there. Please contact me via email.

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd