Reference no: EM132377504
CPCCBC4004A - Identify and produce estimated costs for building and construction projects
Metharom Construction (MC) plans to become a leading provider of housing construction and renovation services in the South-East Melbourne area. The company's overall strategy will be based on a continuing improvement process of setting objectives, measuring results, and providing feedback to facilitate further growth and progress. They have been involved in large stole construction for 3 years and are now branching out to residential housing.
During this unit, you will need to take on the role of the site supervisor. Your responsibilities are to: enforce site safety plans, ensure all tradespersons are inducted before they begin work, conduct regular inspections to ensure building quality, ensure that any contractors are complying with site rules and safe work method statements, identify and correct hazards, ensure that the site is ready for each trade before ' they arrive, and have frequent toolbox talks to ensure that WHS procedures are known and followed.
For more information regarding metharom Construction, please see the appendices and company policy documentation.
Assessment 1. Calculate the total cost of statutory requirements.
Using the project documentation and the information listed in the appendices, calculate the cost of the following for the build:
a) WorkCover
b) EPA permits
c) Building permits
d) Waste management
e) Site facilities, including a minimum of toilets, office, and meal area.
You will need to prepare an Itemized spreadsheet that explains the cost of each, any quantities required (as appropriate), and a total for these costs.
Assessment 2: Estimate the cost of site preparations and present in the form of an Excel spreadsheet.
Create an estimate for the costs of preparing the site so that building may begin. Your spreadsheet must show the following components:
a) Heavy equipment requirements, including earthmovers and trucks
b) Labour costs for levelling the block: including number of workers, average hourly rate, and total labour costs
c) Apply overhead recovery margins of 15% to each subtotal (plant and labour)
Your spreadsheet must be itemised so that the price of each cost is listed, the 15% overhead recovery is applied, subtotals are listed, and a grand total is listed.
Assessment 3: Prepare an estimate of the labour costs associated with farming.
With reference to the project documentation provided in the appendices, create a spreadsheet that shows the cost of labour for the framing of the ground floor of the build. Ensure that you include:
a) An estimate of how many employees will be required
b) The approximate amount of hours that each employee will be required for (assuming that the work day is 8 hours long)
c) The average rate that the employees would be paid
d) The total cost of labour for the framing
It is your responsibility to ensure that each of these can be clearly interpreted from your spreadsheet.
Assessment 4: Produce an estimate of the cost of sanitary ware for the building project.
Produce an estimate for the cost of sanitary ware (showers, baths, sinks, toilets but additional tap ware) required for the home, using the plans and drawings provided in the appendices. You will need to produce a document that shows:
a) The list of materials required
b) The quantities of each material
c) Estimate the unit price of each item
d) Prices from a minimum of 2 suppliers
The prices do not need to all be available from the same 2 suppliers; however you must have a price from any 2 different suppliers. You will also need to ensure that your spreadsheet is itemised, and that others will be able to understand.