Car park system analysis and designthis system must provide

Assignment Help Software Engineering
Reference no: EM13371336

Car Park System Analysis and Design

This system must provide for the day-to-day operation for car park-issuing tickets, handling payment and controlling barriers.

Operational System

The car park operational system controls entry to & exit from a car park and payment for car parking. Customers pay for their use of car park at the time they use it,

Entry to the Car Park

When a car approaches an entry barrier, its presence is detected by a sensor under the road surface, and a ‘Press Button' display is flashed on the control post.

Customer must press a button on the control post, and a ticket is printed and issued.

The ticket must be printed within five seconds. A ‘Take Ticket' display is flashed on the control post. If the car park is full, no ticket is issued, and a ‘Full' display is flashed on the control post. If a vehicle leaves the car park, then the ‘Press Button' display is activated again where there is a vehicle waiting.

When the customer pulls the ticket from the control pillar, the barrier is raised.

The ticket issued to each customer has a bar code on it. The bar code has a number on it and the date (ddmmyyyy) and time (hhmmss) of entry to the car park. The number, date and time of entry are also printed on the ticket in human readable form.

The details of the ticket are stored: ticket no., issue date, issue time, issuing machine.

The number of vehicles in the car park is incremented by 1 and a check is made against the capacity of the car park. If the car park is full, then a display near the entrance is switched on to say ‘Car Park Full', and no further tickets are issued until a vehicle leaves the car park.

Payment system

When the customer is ready to leave, he or she must go to a pay station to pay. The ticket is inserted into a slot, and the bar code is read. The ticket bar code information is compared with the stored information. If the dates or times are not the same, the ticket is ejected, and the customer is told (via an LCD display) to go to the office. In the office, the attendant has a bar code reader and can check a ticket. Typically the problem is damage to the bar code on the ticket, and the attendant can use the office system to calculate the charge, take payment and validate the ticket.

At the pay station, if the ticket dates and times are the same as the bar code dates and times, then the current date and time are obtained, and the duration of the stay in the car park is calculated. From this the car park charge is calculated and displayed on the LCD display. Calculation and display of the charge must take no more than two seconds.

As soon as the amount accumulated exceeds the charge, the ticket is validated. The current date and time are added to the stored data for that ticket (payment date, payment time).

If the amount entered exceeds the charge and change is available, then the amount of change is calculated and that amount of change is released into the return tray. Otherwise, no change is given. In either case, a message is displayed on the LCD display.

The ticket has the payment date and time printed on it and is ejected from the ticket slot. Printing and ejection should not take more than 20 seconds.

Leaving the Car Park

When the customer drives up to the exit barrier, the car is detected by a sensor, and an ‘Insert Ticket' display is flashed on the control post. The customer must insert the ticket. The bar code is read and a check is made that no more than 15 minutes have elapsed since the payment time for that ticket. If more than 15 minutes have elapsed, an intercom in the control post is activated and connected to the attendant in the car park office. The customer can talk to the attendant, and the attendant can view the details of the ticket on his or her computer. The attendant can activate the barrier remotely, for example if there is a queue to get out and the customer is likely to have been reasonably delayed.

If no more than 15 minutes have elapsed, the barrier is raised. A sensor on the other side of the barrier detects when the car has passed and the barrier is lowered.

The number of vehicles in the car park is decremented by 1 and a check is made against the capacity of the car park. If the car park was full, then the display near the entrance is switched to say ‘Spaces', and a check is made to see if any vehicles are waiting. If they are, then the control pillar for the first waiting vehicle is notified. If the driver of the vehicle waiting there does not press the button (for example, because they have backed out and left), then the control pillar for the next waiting vehicle is notified.

At any time, the attendant can view the status of a pay station or a barrier control post Once a connection is made, the status is updated every 10 seconds.

General tasks and milestones

Use the following case study to write a Business Requirements Statement for the new system. Use the Unified Modelling Language (UML) to do your logical design.

General:
• Cover page and Table of Contents
• Introduction ( Term of references)
• Neatness (readability, tidy presentation, etc.)
• List all non-functional requirements (Read the use case scenario).

Milestone 1
• Actor Glossary ( a List of actors[roles] related to the system )
• Use Case Glossary ( A list of all use cases for the system)

Milestone 2
• Analysis Use Case Model Diagram for whole system
• Analysis use case narrative for ‘payment' use case

Milestone 3
• Identify "boundaries", "controller "and "entities" objects for "Entry control" Usecase.
• Transfer "Entry control" Usecase diagram to a communication diagram
• Draw an ERD diagram obtained from "Entity" objects identified in the obtained communication diagram.

Millstone 4
• Produce Activity Diagram (Including swim lanes) for ‘"Payment" use Case

• Produce sequence diagram for ‘"leaving car park" use Case

Millstone 5
• Produce analyse class diagram for obtained objects in "Entry control" Usecase.
• Transfer the analysis class diagram to a design Class diagram.

Reference no: EM13371336

Questions Cloud

Bullthe table and graph shown below illustrate the demand : bullthe table and graph shown below illustrate the demand and supply schedules for television sets in venezuela a small
Q1 show all workingsdont count the number of divisions do : q1. show all workings.dont count the number of divisions. do not use asymptotic notation instead provide exact
Phase 1 planning 1 select a name for the company2 determine : phase 1 planning 1. select a name for the company.2. determine the short-term goals of the company.3. determine the
Compute the mean median mode and standard deviation for the : compute the mean median mode and standard deviation for the following discrete probability distribution.value of
Car park system analysis and designthis system must provide : car park system analysis and designthis system must provide for the day-to-day operation for car park-issuing tickets
A sample of data on daily prices of three petrol stations : a sample of data on daily prices of three petrol stations over a two week period have been collected in the table
1select two of the following scenarios explain why you : 1.select two of the following scenarios. explain why you selected each and give an example of how statistics might be
Requirementsthis project requires you to program a : requirementsthis project requires you to program a maze-type game using assembly language. it is not acceptable to use
1 the ordered pair x y is a subset of x y justify your : 1 the ordered pair x y is a subset of x y. justify your

Reviews

Write a Review

Software Engineering Questions & Answers

  How software architecture department can support production

Explain how Software Architecture Department can support production, inventory, sales, and marketing to assure Zilack can meet its business objectives.

  Software development process

Imagine you are a team leader in a large software development organization and you want to improve a software development process (of your choosing) through the use of a CASE tool.

  Write the definition of the function min

Add the function min to the class arrayListType to return the smallestelement of the list. Also, write the definition of the function min and a program to test this function.

  Create graph which shows congestion window size

Design another scenario as duplicate of Drop_Fast scenario. Write the new scenario Drop_Fast_Buffer. In new scenario, edit attributes of Client_East node and assign 65535 to its Receiver Buffer.

  Q1 what is regression testing explain various types of

q.1 what is regression testing? explain various types of regression testing.nbspq.2 what are the various steps by which

  Create visual logic flow chart-calculate pay of employees

The user will then be able to continue calculating the pay for additional employees until the user decides to stop or until the maximum number of employees is reached. Create a Visual Logic Flow Chart.

  Develop flowchart to prompt user to enter sales tax rate

Develop pseudocode and flowchart for program which does the following: Prompt user to enter sales tax rate. Prompt user to enter a price.

  Identify the data type for variable

Assume you manage a dog walking service, in which you interact with both clients and dog walkers. Your task is to schedule dog-walking appointments based on the customers requested dates and times and the availability of the dog walkers.

  Sketch the e-r diagram for university

Sketch the E-R diagram for each of the following situations (if you believe which you need to make extra assumptions, clearly define them for each situation).

  Find problems which software engineers dealt with in past

The lecture and text discussed challenges and problems which Software Engineers have dealt with in the past. Investigate what you consider to be the challenges facing software engineering in the next 20 years.

  Calculation of the hypotenuse

Construct a C# console application that calculate the hypotenuse of a right triangle. The calculation of the hypotenuse of a right triangle is based on the Pythagorean Theorem:

  What is the pattern in the optimal allocation

What are the optimal production quantities for the company? What is the pattern in the optimal allocation?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd