Calculate the project internal rate of return

Assignment Help Financial Management
Reference no: EM131917933

Suppose you have been hired as a financial consultant to Defense Electronics, Inc. (DEI), a large, publicly traded firm that is the market share leader in radar detection systems (RDSs). The company is looking at setting up a manufacturing plant overseas to produce a new line of RDSs. This will be a five-year project. The company bought some land three years ago for $7 million in anticipation of using it as a toxic dump site for waste chemicals, but it built a piping system to safely discard the chemicals instead. If the land were sold today, the net proceeds would be $7.75 million after taxes. In five years, the land will be worth $8.05 million after taxes. The company wants to build its new manufacturing plant on this land; the plant will cost $13.6 million to build. The following market data on DEI’s securities are current: Debt: 46,500 6.8 percent coupon bonds outstanding, 20 years to maturity, selling for 93.5 percent of par; the bonds have a $1,000 par value each and make semiannual payments. Common stock: 765,000 shares outstanding, selling for $95.50 per share; the beta is 1.14. Preferred stock: 36,500 shares of 6.2 percent preferred stock outstanding, selling for $93.50 per share. Market: 7 percent expected market risk premium; 5.2 percent risk-free rate. DEI’s tax rate is 35 percent. The project requires $900,000 in initial net working capital investment to get operational. a. Calculate the project’s Time 0 cash flow, taking into account all side effects. Assume that any NWC raised does not require floatation costs. (A negative answer should be indicated by a minus sign. Do not round intermediate calculations and enter your answer in dollars, not millions of dollars, e.g., 1,234,567.) Time 0 cash flow $ b. The new RDS project is somewhat riskier than a typical project for DEI, primarily because the plant is being located overseas. Management has told you to use an adjustment factor of +2 percent to account for this increased riskiness. Calculate the appropriate discount rate to use when evaluating DEI’s project. (Do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.) Discount rate % c. The manufacturing plant has an eight-year tax life, and DEI uses straight-line depreciation. At the end of the project (i.e., the end of Year 5), the plant can be scrapped for $1.65 million. What is the aftertax salvage value of this manufacturing plant? (Do not round intermediate calculations and enter your answer in dollars, not millions of dollars, e.g., 1,234,567.) Aftertax salvage value $ d. The company will incur $2,450,000 in annual fixed costs. The plan is to manufacture 14,500 RDSs per year and sell them at $11,900 per machine; the variable production costs are $11,100 per RDS. What is the annual operating cash flow, OCF, from this project? (Do not round intermediate calculations and enter your answer in dollars, not millions of dollars, e.g., 1,234,567.) Operating cash flow $ e. Calculate the project's net present value. (Enter your answer in dollars, not millions of dollars, e.g., 1,234,567. Do not round intermediate calculations and round your answer to 2 decimal places, e.g., 32.16.) Net present value $ Calculate the project's internal rate of return. (Do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.) Internal rate of return ?

Reference no: EM131917933

Questions Cloud

Spreadsheet model to calculate net present value of profit : Develop a spreadsheet model to calculate the net present value of profit over a 3-year period, assuming a 4% discount rate.
Two other combinations of loans : Suggest two other combinations of loans, options and the underlying stock that would give the person the same payoffs
How much money will shareholders have after three years : How much money will shareholders have after 3 years under each of George's alternatives and what should he do?
Which offers accounting rate of return : n alternative (mutually exclusive) project is available which offers an accounting rate of return of 8%, a classical payback period of 5 years
Calculate the project internal rate of return : Calculate the project's internal rate of return. What is the aftertax salvage value of this manufacturing plant?
Company adjusted weighted average cost of capital : A retail company is selling high-end golf clubs. What is the company's adjusted weighted average cost of capital?
Currency risk management activities in their annual reports : Multinational companies normally mention their currency risk management activities in their annual reports (10-K).
Statement about swaps is least accurate : Which of the following statement about swaps is least accurate?
About purchasing new stadium equipment : Town Entertainment is thinking about purchasing new stadium equipment that cost $550,000 and would cost another $75,000 to install.

Reviews

Write a Review

Financial Management Questions & Answers

  Is there evidence of long range dependence

Compute the first 100 lags of the ACF of the absolute daily simple returns of IBM stock. - Is there evidence of long-range dependence? Why?

  Determine the minimum size screen

Determine the minimum-size screen, in square feet, required to handle the crusher output. If the screening unit is 4 ft wide, what will be the nominal screen sizes?

  Investment contract that pays equal

Peter Lynchpin wants to sell you an investment contract that pays equal $13,300 amounts at the end of each of the next 23 years. If you require an effective annual return of 8 percent on this investment, how much will you pay for the contract today?

  What is the tax bill for each firm-corporation income

Corporation Growth has $87,000 in taxable income, and Corporation Income has $8,700,000 in taxable income. Use the tax rates from Table 2.3. (Do not round intermediate calculations.) What is the tax bill for each firm? Firms Taxes Corporation Growth ..

  Capital market that the annual inflation rate

In October 2013, there is a consensus in the capital market that the annual inflation rate is likely to be 3.5% in US and -1.5% in China for the next two years.

  What is the amount of the fixed cost per unit

Adept NV is analyzing a proposed project. The company expects to sell 2,500 units, give or take 10%. The expected variable cost per unit is €8 and the expected fixed costs are €12,500. The sale price is estimated at €16 a unit, give or take 2%. The c..

  Considering applying for federal department of energy

Rural Consolidated Fire Services (RCFS) is considering applying for a Federal Department of Energy (DOE) grant that would allow it to install solar panels.

  What is the liquidity premium on niendorf bonds

Niendorf Corporation's 5-year bonds inflation premium for 5-year bonds yield 9.50%, and 5-year T-bonds yield 4.80%. The real risk-free rate is r = 2.75%, the inflation premium for 5 years is IP = 1.65%, the default risk premium for Niendorf's bonds I..

  What is included in the terminal cash flow

What is included in the annual differential/ incremental cash flows? What is the impact of an increase or decrease in depreciation expense? What is included in the terminal cash flow?

  Calculate the NPV of the assembler if required rate of rate

ABC Service can purchase a new assembler for $15,052 that will provide an annual net cash flow of $6,000 per year for five years. Calculate the NPV of the assembler if the required rate of return is 12%. Artie's Soccer Ball Company is considering a p..

  Calculate DCFROR and NPV project life

Consider an investment of $500,000 at time zero for machinery and equipment to be depreciated using 8 year straight line depreciation starting in year 1 to year 8. Salvage value of the machinery and equipment is expected to be zero. The minimum DCFRO..

  Estimate made from the three estimation methodologies

What is the cost of new common equity considering the estimate made from the three estimation methodologies?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd