Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
4. Using Quartus II, or an equivalent VHDL entry program, develop the text file and simulation for the shift register specified in Problem 3. Verify the timing diagram shown in Problem 3. Attach the .vhd and simulation files Diagram from question 3 is attached as a 10-bit serial-in/serial-out shift register 5. Using Quartus II, or an equivalent VHDL entry program, develop the text file and simulation for the 74LS194A universal, bi-directional shift register. Attach the .vhd and simulation files.
A 60-watt outdoor lightbulb is advertised as having an average life (i.e. MTTF) of 1,000 operating hours. However, experience has shown that it will also fail on demand an average of once every 120 cycles.
Design a sequence detector which produces an output 1 everytime the sequence 0101 is detected and output 0 at all other times use any flip flop.
Assume that an additional inductance can be inserted in series with the load. Also assume that the converter has no freewheeling diodes. Calculate the added inductance that leads to a conduction period of 180 degrees when alpha = 30 degrees.
An antenna with a radiation resistance of 48 ohms, a lossresistance of 2 ohms, and a reactance of 50 ohms is connected to agenerator with open-circuit voltage of 10 V and internal impedanceof 50 ohms via a λ/4-long transmission line.
Bit 4 of Port B is connected to a switch that normally outputs a zero. Monitor this switch to detect a change from zero to one. Immediately when it becomes one, call a function to toggle Bit 5 of Port B, which is connected to an LED.
The program is to input the number character-by-character and then assemble them together so that the original number is put into a floating point variable and displayed back to the monitor.
There are two printers and two I/O ports available in a system. Process A is using an I/O port and is waiting for a printer. Process B is using a printer. Process C is using a printer and is waiting for an I/O port.
a. if the input r(t)=5u(t), ie. R(s)=5/s, find the steady-state of C(t), b. Approximately how many seconds are required for the system to reach steady state note you two time constants to consider, and c. Do you expect the transient response to be o..
using 1/(s+2)(s+4) + c find when the poles are repeated and use that value to calculate the impulse response using laplace transforms. Calculate the step response when c = 10 using Laplace transforms.
A highway curve of radius 500 m is designed for traffic moving at a speed of 90 km/hr. What is the correct banking angle of the road
Consider the analog filter H(s)=30000/(s^2+400s+30000) , notice that the filter gain in the passband is unity or 0 dB. You can also use MATLAB command "roots" to check for the poles that are p_1=-100 rad/s, and p_2=-300 rad/s.
Get digital still images and video sequences from the Internet, as needed. You can use color and/or gray-scale images. 2. Implement intra-frame DPCM . Start with a linear quantizer in the initial implementation.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd