Advisor brought in by the spanish government

Assignment Help Project Management
Reference no: EM131828232

The Spanish Navy Pays Nearly $3 Billion for a Submarine That Will Sink Like a Stone In 2003, shipbuilders at Navantia, Spain's state owner shipyard, welcomed a contract from their navy to construct four state-of-the-art submarines. The S-80 class was going to be an engineering marvel, filled with the latest and most cutting-edge technology, including a diesel-electric propulsion system that would be 20% lighter than other ships, while delivering 50% more power. As the list of upgrades and new technical gadgetry grew, the delivery date for the Isaac Peral-the lead ship in the S-80 class-continued to ship further behind schedule. Nevertheless, it wasn't the continuous upgrading

and addition of new equipment that finally slammed the brakes on the project; it was the startling warning from Navantia's engineers that the Isaac Peral was not seaworthy. The submarine, named in honor of the Spanish man credited by some as the inventor of the underwater vessel, was 75-100 tons overweight, an excess that could make it difficult or impossible for the submarine to surface after submerging. As a result, the Spanish navy was faced with the challenge of fixing a submarine that ran the risk of disaster whenever it decided to submerge! Navantia admitted the existence of "deviations related to the balance of weight" in the vessel and estimated it would take up to two years more to correct the problem, pushing the new delivery date to late 2018. The firm's engineers are trying to determine their best options at this point. It appears that two choices are most likely: Find a way to trim the design of the overall ship, which would be very difficult at this stage in construction, or lengthen the hull of the already 233-foot submarine to compensate for the extra weight. The problem with this option is that designers have estimated that for every meter the hull is lengthened, it will end up costing

nearly 10 million additional euros (about $14 million dollars). Unfortunately for the Spaniards, independent agencies report that they have already sunk the equivalent of $680 million into the Isaac Peral, and a total of $3 billion into the entire quartet of S-80 class submarines. The buoyancy problem is not the only difficulty facing the program; an analyst said that that submarine's air-independent propulsion (AIP) system reactor is also under performing. A Strategic Studies Group spokesperson said that the AIP system has been designed to enable the submarine to operate underway for 28 days but is currently able to manage only one week. The Group's memo suggests, "The buoyancy problem alone could cost up to half a billion euros to cover redesign and extra construction, without considering the propulsion problem." The submarine setback couldn't have come at a worse time for Prime Minister Mariano Rajoy, who was already caught up in a corruption scandal and saw his approval rating hit a record low in 2013. Because of the poor shape of Spain's economy, Rajoy's austerity cuts trimmed the Spanish military budget by 30 percent in 2012, leaving much less room for added ballast. With reports that the S-80 program will be delayed an estimated two years and another general election looming in 2015, Rajoy likely will not see the submarines through to successful

launch.How did such an expensive project get funded at a time when the Spanish military's entire special weapons program received a 98% cut? Sheer pride seems to

have been a factor: Spain hoped the S-80 class would be a new homegrown breakthrough achieved without foreign help. Now that Navantia has entered into a $15 million contract with the Electric Boat Division of America's General Dynamics to help with the redesign, that dream seems dead in the water.

Questions

1. Google "Spain's S-80 class submarine" and read some of the articles posted. In your opinion, how does technical risk cause problems with major defense projects?

2. Why do you think it is common for defense contractors to add new features and modifications to current programs? In other words, why do defense agencies contract for one project, only to see it often evolve into something new by the time it is launched?

3. If you were an advisor brought in by the Spanish government, what advice would you offer

Reference no: EM131828232

Questions Cloud

Project manager on a critical project for corporation : You have decided to employ fault-tree analysis on your project. What is fault-tree analysis, and how can it be applied to your project?
Identify the basic principles of cash management : Hank Cook is confused about the lack of agreement between the cash balance per books and the balance per bank.
Manager on a critical project for corporation : You have decided to employ fault-tree analysis on your project. What is fault-tree analysis, and how can it be applied to your project?
Brink of success in the commercial airframe industry : Coming off its excellent work during World War II, the company believed that it stood poised on the brink of success in the commercial airframe industry.
Advisor brought in by the spanish government : If you were an advisor brought in by the Spanish government, what advice would you offer
Explain what is an NSF check : Trisha Massey asks for your help concerning an NSF check. Explain to Trisha whether it will require an adjusting entry on the company's books.
How does convergence apply to the communications industry : What is the difference between a logical connection and a physical connection? How does convergence apply to the communications industry?
Perform a literature review to identify risks : For the same campus event project, perform a literature review to identify risks.
What kind of applications might use a sensor network : What kind of applications might use a sensor network? Why is a network architecture useful? List the five layers of the TCP/IP protocol suite.

Reviews

Write a Review

Project Management Questions & Answers

  Describe areas in which packaged information may be applied

Describe some areas in which packaged information may be applied.- Describe how your library helps categorize the many databases to guide in your selection of sources appropriate for business.

  Proposal for a quality improvement project please i want

please i want plagiarism free assignment send me the plagiarism report ltbrgt ltbrgti will attach the question for the

  How do you manage project risk as a project manager

How do you manage project risk as a project manager? In your own words (NO QUOTED definition) define "what a risk is" in project management?

  Create a balanced set of metrics that could be used

Create a balanced set of metrics that could be used to evaluate whether or not the 10K run was a success. Be sure to consider interim measures as well as end of

  Question about project choicesthe new financial analyst

question about project choicesthe new financial analyst does not like the paybak approach in - 35091 - and determines

  How the fish bone diagram is created

In addition, in your paper include a discussion on: How the Fish Bone diagram is created. The benefits of using a Fish Bone diagram. An example of when the Fish Bone diagram is most useful

  Describe the anticipated expected content

In each section and subsection, insert a couple of sentences (or short paragraph) describing anticipated/expected content. The last section of the outline must be a bibliography with at least 2 references.

  Prepare a cms-pm projects on palace asturia theatre

Prepare a CMS/PM Projects on Palace Asturia Theatre (Retro/Indie Movie Theatre). "This client is a retro/indie movie theatre in Newtown that focuses on independent releases and retro theme nights.

  Job description for the project manager roledetails this is

job description for the project manager roledetails this is a new position and your manager has asked you to write a

  Explain why the use of adr is increasing

Explain why the use of ADR is increasing.- When will a judge overturn an arbitrator's decision?- Explain how to secure arbitration as a means of resolving a dispute.

  Summary of the role of a project manager

Research the Phase Resources to research the role of the project manager, and then write a 150-word summary of the role of a project manager.

  Prepare a recommendation report

Prepare a justification/recommendation report that studies the several ordering options and proposes the most appropriate one for Mr. Vanilli's business.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd