Use plain dumb-bell type and center-bulb sort, Civil Engineering

Assignment Help:

Question

While selection of waterstop, shall engineers use plain dumb-bell type , center-bulb sort?


Answer

Plain dumb-bell kind is used for joint site where small movements are anticipated. So, construction joints are desirable sites of this type of waterstop. On other hand, center-bulb type waterstop is appropriate for growth joints or locations anywhere lateral and shear movements happen due to settlement.

 


Related Discussions:- Use plain dumb-bell type and center-bulb sort

Geotechnical engg., friction circle method of stability of slope

friction circle method of stability of slope

What is rapid sand filter, Q. What is Rapid Sand Filter? A Rapid Sand F...

Q. What is Rapid Sand Filter? A Rapid Sand Filter is a water treatment plant that includes provision for pre treating the water by coagulation and sedimentation for settlement

Rcc lintel, how to make a leakproof joint with existing lintel

how to make a leakproof joint with existing lintel

Explain measured shovel packing, Explain Measured shovel Packing Measu...

Explain Measured shovel Packing Measured shovel Packing essentially consists of accurate measurements of track defects particularly the unevenness and voids caused in the cour

Mohrs circle, The state of stress at a point is given through the stress co...

The state of stress at a point is given through the stress components sx = 70 MPa, sy = 10 MPa, and txy = - 40 MPa. Using Mohr''s circle find (i) Principal stresses, and (ii) Princ

Explain the difference in elevation between bm and tp2, Based on the inform...

Based on the information provided in Figure, the difference in elevation between BM and TP 2 is most nearly: Solution: Set up a Table as shown below and insert the kno

Guidelines for selection of site, Guidelines for Selection of Site: Th...

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

Slab, Design of one way slab, two way slab, circular slab, hollow slab step...

Design of one way slab, two way slab, circular slab, hollow slab step by step as ACI code 318-08, tnx

Radial contouring, How we can find R.L. of instrument station without movi...

How we can find R.L. of instrument station without moving of instrument.

Rubber dams – air-filled vs water-filled, Most of the existing rubber dams ...

Most of the existing rubber dams are of air-filled types. Water-filled rubber dams aren't preferred for the below reasons: (i)  By giving same sheet length and dam height, tensi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd