The velocity distribution in the gap is linear, Mechanical Engineering

A 10 kg block slides down a smooth inclined surface as shown in Figure. Show the terminal velocity of the block if the 0.1 mm gap among the block and the surface have SAE30 oil at 20°C. Suppose the velocity distribution in the gap is linear, and the area of the block in contact with the oil is 0.2 m2.

59_33.png

Posted Date: 3/15/2013 2:08:47 AM | Location : United States







Related Discussions:- The velocity distribution in the gap is linear, Assignment Help, Ask Question on The velocity distribution in the gap is linear, Get Answer, Expert's Help, The velocity distribution in the gap is linear Discussions

Write discussion on The velocity distribution in the gap is linear
Your posts are moderated
Related Questions
Priority Rules A main concern rule is an algorithm that evaluates a priority number PN j for all operation j which enters the queue in front of a station (processing, cell, wo

Three forces act on particle: Thr ee forces act on particle ' O ' as shown in the figure given below. Determine the value of ' P ' such that resultant of these three forces

Limit of proportionality: Limit of proportionality is the stress at which the stress - strain diagram ceases to be a straight line that is, stress at which the extension ceas

(a) Evaluate the buckling load of column with one end fixed other free of 8m length by using Euler's formula. Given : I min = 1390m 4 E = 2 X 10 5 N/mm 2 (b) Derive a

hey i really need someone to help doing my control course work asap cuse it is due sunday it is about Control of water level in a nonlinear ‘V’ shaped tank

Editing Dimensions The dimension edit commands, DIMEDIT and DIMTEDIT are used basically to adjust the position of the text part of a dimension. This is usually only necessary,

Compute the diameter of a solid shaft: Compute the diameter of a solid shaft transmitting 150 kW at 25 rpm, if the maximum shear stress in the shaft is not to exceed 70 MPa. C

Explain Numerical Control (N.C) Procedure a) Process Planning: - This is listing of the sequence of operation to be performed during manufacturing of a part. This as well lists

Determine the economic order quantity: Determine the economic order quantity and the reorder point. Given Annual demand (D) = 2,000 units Average daily demand (d) = 2,00

how to find acceleration by Klein construction