Survey process - issues of power supply, Electrical Engineering

Survey Process -  issues of power supply

The steps to be followed in any like survey procedure are given below. There is always a possibility of going back to any previous step by feedback system in case of any discrepancy or any modification is survey objectives. These steps are self explanatory.

  1. Obtain Top Management Buy - In
  2. Determine Survey Objectives
  3. Exploratory Research
  4. Plan Sampling and Data Collection
  5. Design of Questionnaire
  6. Actual Survey
  7. Data Refining and Analysis
  8. Recommendation and Implementation Plan
  9. Plan Timing of Next Survey
  10. Survey Methodology

The customer satisfaction survey commonly conducted for the reasons "To listen to the customer". The reasons for this survey is

1. To search out the reasons for customer dissatisfaction

2. To search out the focus of attention for process improvement

3. To determine whether previous improvement efforts have worked

4. To see whether strategic advantages or disadvantages exist.

Posted Date: 2/6/2013 2:50:56 AM | Location : United States







Related Discussions:- Survey process - issues of power supply, Assignment Help, Ask Question on Survey process - issues of power supply, Get Answer, Expert's Help, Survey process - issues of power supply Discussions

Write discussion on Survey process - issues of power supply
Your posts are moderated
Related Questions
Q. How can a JFET be used as a constant current source? Explain from the drain characteristics. As the VDS voltage is increased from 0 to a few volts, the current will increase

History of Transistor: The great Physicist Julius Edgar Lilienfeld filed the first patent for a transistor in Canada in the year 1925, explaining a device identical to a Field

Q Point charges, each of √4πε0 C, are located at the vertices of an equilateral triangle of side a. Determine the electric force on each charge.

Draw a logic diagram to implement F=ABCDE using only 3 input AND gates

Q. Explain Time-invariant versus time-varying systems? When the parameters of a control systemare stationary with respect to time during the operation of the system, the system

A Platinum resistance temperature sensor has a resistance of 120 ohm at 0°C and forms one arm of a Wheatstone bridge. At this temperature the bridge is balanced with each of the ot

Discuss the term D/A conversion. D/A conversion: Digital-to-analog or analog-to-digital conversions are two very significant aspects of digital data processing.  Digital-to-

Q. An 8-bit A/D converter is driven by a 1-MHz clock. Estimate the maximum conversion time if: (a) It is a counter-controlled A/D converter. (b) It is a successive-approximat

A balanced three phase, four wire, WYE connect load consisting of per phase resistenance of A ohms and inductive reactance of D ohms/phase is connected to a B000 V three phase sour

Explain Open Loop Control Systems In an open-loop control system, the controller independently computes exact voltage or current required by the actuator to do the job and send