Step  for construction of string Diagram

To construct a diagram the  following  steps are required.

1. Step 1 produce a scale map  of the work  area identifying  all machines  furniture and other  equipment  in the diagram  that can be moved. These could  be shaped as piece of card that can  be pinned  to the work area  map.

2. Step2: Indentify  the point  in the process where actions  take  place and mark the positions  of  these on the  map with  map pins  and action symbols.

3. Step:3: Tie  the end  of  piece  of string to the pen wheel the process starts  and then wrap  it  around  each pen in turn following the movement around the process.

4. Step 4:  Mark  the string  at the start  and finish  points  using  a pen.

5. Step 5: Measuring  between the pen  marks  will give the total  distance travelled during  the process.

6. Step 6: Rearrange the movable items  on the  map aiming to reduce the total  distance.

The objectives  of marking  out a string  diagram are three fold:

a.  To control  backtracking,

b.  To reduce excessive travel,

c. To bring  out  points  of traffic congestion,


Related Discussions:- Step for construction of string diagram

#Process design plant locatiom.., Relation with types of manufacturing plan...

Relation with types of manufacturing plant location and layout.?

Explain how many observations would be needed, To determine the standard wo...

To determine the standard working time for a special job, following observation data is collected: Observation 1 2 3 4 5 6 7 8 Time (in second) 17 18 15 14 13 15 16 13 a) If the pe

Procurement, 1. Can the Japanese system of Keiretsu be duplicated in other ...

1. Can the Japanese system of Keiretsu be duplicated in other countries?  2. How do you distinguish between procurement, logistics management, materials management and supply ch

Traditional accounting based measurements, Traditional Accounting Based Mea...

Traditional Accounting Based Measurements and Their Limitations  Neely (1999) suggests that traditional financial measures of performance are criticised because they:

Explain what is the critical path, The following represents a project that ...

The following represents a project that should be scheduled using CPM: Time (DAYS) Activity Immediate Predecessors a m b A - 1 3 5 B - 1 2 3 C A 1 2 3 D A 2 3 4 E B 3 4 11 F

I need excel backup to understand a problem, Need Excel backup to understan...

Need Excel backup to understand how to answer this question. Bob White leaned back and wiped his forehead with his hand. He was the president of the home oven division of Winkley &

Explain situational or behaviorial interview, Contrast an unstructured with...

Contrast an unstructured with a situational or behaviorial interview. Also, discuss how an organization might improve the reliability and validity of the interview

What is a realistic time-horizon for the sale, Identify key gaps in plannin...

Identify key gaps in planning for the exit. Provide recommendations on the exit strategy. Is the sale the right one? What steps ought to be taken to maximize the sales-price? What

Explain a jet engine has ten components in series, A jet engine has ten com...

A jet engine has ten components in series. The average reliability of each component is 0.998. What is the reliability of the engine? (Round your answer to 3 decimal places, the

Explain how does this sort of thing happen in organizations, We have all wo...

We have all worked with someone who did not seem to fit the role for which he or she was hired, or did not seem to fit in with the organization, or did not have the right skills fo

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd