Show the functions of hydraulic jump, Civil Engineering

Assignment Help:

Q. Show the Functions of hydraulic jump?

The usage of hydraulic jump in hydraulic engineering isn't uncommon and creation of such jumps has numerous purposes: 

(i)  Its major aim is to perform as an energy-dissipating device to decrease the excess energy of water flows.

(ii) The jump produces significant disturbances in the form of eddies and reverse flow rollers to facilitate mixing of chemicals.

(iii)At the time of the jump formation, significant amount of air is entrained so that it helps in the aeration of streams that is polluted by bio-degradable wastes.

(iv) Itallows efficient operation of flow measuring device such as flumes.


Related Discussions:- Show the functions of hydraulic jump

Explain the categories of air pollution, Explain the Categories of Air Poll...

Explain the Categories of Air Pollution 1. Ambient Air Pollution Out door environment o Involves complex array of sources and pollutants, meteorological transport of th

Explain sedimentation, Explain Sedimentation 1. Sedimentation bas...

Explain Sedimentation 1. Sedimentation basin or clarifier is used to remove particles that will settle in a reasonable time period 2. Basins are usually rectangular or

Concrete structure, which section is most effective for a design of beam an...

which section is most effective for a design of beam and why

Explain census of traffic at level crossings, Q. Explain Census of Traffic ...

Q. Explain Census of Traffic at Level Crossings? Periodical census of traffic at all level crossings, unmanned/manned should be taken at least once in five years to review the

Transportatoin engineening, explain the construction while aligning roads o...

explain the construction while aligning roads on hilly areas

Surveying, what do you understand by the term local attraction

what do you understand by the term local attraction

What is the withdrawal force of steel nails, In engineering, the code-allow...

In engineering, the code-allowable withdrawal force is zero, due to the wood expands and contracts over time and the nail pullout force can decrease to zero

Concrete, Determine the quantity of materials required per batch and probab...

Determine the quantity of materials required per batch and probable output from a concrete mixing plant of 1200lts capacity. The design per 1000lts of mixed concrete is as follows

Raking piles of bridge abutment placed under an embankment, Question It sho...

Question It should be necessary that raking piles of a bridge abutment be placed under an embankment ? Answer For a bridge abutment to be supported on raking piles with div

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd