school building, Civil Engineering

from surveying to school building finish
Posted Date: 11/1/2012 2:34:09 AM | Location : United States







Related Discussions:- school building, Assignment Help, Ask Question on school building, Get Answer, Expert's Help, school building Discussions

Write discussion on school building
Your posts are moderated
Related Questions
what is the difference between feasibility study and traffic counting

Explain the term - Loss of Prestress At the transfer stage, tendons produce compressive stresses in concrete. Sooner or later, the magnitude of  these stresses experiences a re

how to compute the compound elements particularly outstanding element of compression flange if 2-ismb300 are placed side by side

sir i want to know that which pages of IS800:2007 is used for steel design of tension member, compression member, collumn, beam, connections, trusses etc.. please give me the topic

Pre-tensioning systems In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of  sever

A retaining wall 12 metres high is proposed to hold sand. The values of void ratio and φ in the loose state are 0.63 and 30° whereas they are 0.42 and 40° in the dense state. Suppo


Explain what is Stationing - Transportation 1) Stationing concept is used along horizontal alignments for referencing purpose 2) 1 station = 100 feet 3) How do you repres

In a hydrometer analysis, 0.5 N of soil was mixed in water to form one litre of uniform suspen- sion. The corrected hydrometer reading after a lapse of 60 min. from the start of se

Explain Flocculation Most important factor effecting particle removal efficiency objective - to bring particles into contact so that they will collide, stick together