school building, Civil Engineering

from surveying to school building finish
Posted Date: 11/1/2012 2:34:09 AM | Location : United States







Related Discussions:- school building, Assignment Help, Ask Question on school building, Get Answer, Expert's Help, school building Discussions

Write discussion on school building
Your posts are moderated
Related Questions
a clear illustration about working to part principle and some examples

Define Installation of Pot Bearings? In a sliding POT bearing, positive fixing to the main structure may not be required if the bearing is always subjected to adequate vertical

Loss of prestress due to elastic shortening At the transfer of prestress, tensile stresses of tendons are transferred to concretc in the form of compressive stresses. Due to t

Q. What is Diamond Crossing? Diamond Crossing is provided when two tracks cross each other either of the same gauge or of different gauges. It consists of two acute crossing (

Elongation of bar due to self weight

Two readings ie 1.64m and 0.73m were taken during leveling procedure to define the slope of a centerline of a bridge at points A and B. If distance AB=50 m, find the slope of line

Define the Approach Velocity Typical problems have negligible approach velocity.  v 1 = Q/A, where A = the cross-sectional area of flow in the channel. The value is not the ve

3 types of obstacles in chaining detail


design a 3-meter cantilever slab to carry a uniform total dead load of 8.2KN/m^2 and a concentrated live load at the free end of 30 KN/m. f''c=28Mpa fy=420Mpa.