school building, Civil Engineering

from surveying to school building finish
Posted Date: 11/1/2012 2:34:09 AM | Location : United States







Related Discussions:- school building, Assignment Help, Ask Question on school building, Get Answer, Expert's Help, school building Discussions

Write discussion on school building
Your posts are moderated
Related Questions
Question What is sign of shear slump and collapse slump in slump tests? Answer There are three varieties of slump that might occur in slumps test, specifically, slump, shear


what is the density of rcc

describe the general principle of roof design

Determine the concept of Shrink-fitting of metal tyres Shrink-fitting of metal tyres on the wheels of bullock carts is well known. As the hot metal tyre rings cool down, they a

Explain Equations for a triangular (V-notch weir) Used for small flow rates. C 2 is a coefficient which varies from 0.58 to 0.61 depending upon the notch angle.  Q = C

A loading test was conducted with a 300 mm square plate at depth of 1 m under the ground surface in pure clay deposit. The water table is situated at a depth of 4 m below the groun

Q. Explain Forty-five degree spread rule for driven piles ? For driven piles the length of piles driven into the ground is generally based on dynamic driving formula such as Hi

Explain Fluidized-Bed Incinerators sand is heated to 800C by oil or gas and blown around (fluidized) by a blower that sends air from bottom upward heated fluidized san

who invented the first LA abrasion test machine