school building, Civil Engineering

from surveying to school building finish
Posted Date: 11/1/2012 2:34:09 AM | Location : United States

Related Discussions:- school building, Assignment Help, Ask Question on school building, Get Answer, Expert's Help, school building Discussions

Write discussion on school building
Your posts are moderated
Related Questions
Question What is key function of packing resources in joint of concrete pipes in pipe jacking ? Answer Packing resources are about 10 to 20mm broad and are usually mad

Question What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation? Answer These methods aim at reducing placing tem

Explain the Statements about the Differential Levelling I.  Bench mark (BM) - relatively permanent point of known elevation as indicated on the Contract drawings  II. Back s

Continuous Flow Systems: Transport by road, rail, air or ships takes place in vehicles which move along a path at intervals. As against this, continuous flow systems are those

Define Water jets for underwater inspection of bridge? These tools are widely used and produce a bright metal finish in one operation. Grit entrainment is available and makes t

Define Hydraulic tools for underwater inspection of bridge? Hydraulic tools involve grinders, rotary brushes and scrubbers. The benefits of hydraulic tools are the same as thos

I want to ask about mathcad prime 2.0, when I want to save my work it shows that I can''t save it because Excel is busy ,, what I have to do to fix this problem ??

what do you understand by the term local attraction

what is the theary of reduced levelling