Schedule Evaluation

The schedules are evaluated as per to the criterion weighted loss of slack. Now let t0si be the slack (time buffer) of job I as per to the initial schedule and tsi (n) be the slack of the job i after the continuation number n.

Schedule Selection

The parameter p was set to 10 and q was set to the length of all continuations. Beginning from partial original schedule, 100 various continuations were generated in this way that is two continuation steps were presented. The initial operation of the excellent schedule was allocated to offer the new partial schedule.

Heuristics

The heuristics that were tested in the reduction of the sets S (m) were slack per remaining operation (S/OPN) and simple slack (SL). S/OPN twisted out to be more effectual.

 


Related Discussions:- Schedule selection -schedule evaluation-heuristics

Determine the maximum value of the coefficient of friction, Determine the m...

Determine the maximum value of the coefficient of friction: A force of 200 N inclined at 60 o to the horizontal is applied to the block A weighing 400 N. find out whether blo

Design of the plc ladder and profibus - asi network, 1 Prepare an updated s...

1 Prepare an updated sketch of the electro-hydraulic system shown in Figure showing the actuators in their start position appropriate to your allocated actuator sequence. 2 By u

Clausius inequality - thermodynamics, Clausius inequality - thermodynamics:...

Clausius inequality - thermodynamics: Whenever closed system undergoes cyclic process, cyclic integral is less than zero (that is negative) for an irreversible cyclic process

Determine the deflection of the spring, Determine the deflection of the spr...

Determine the deflection of the spring: A close coiled helical spring deflects 25 mm under a certain axial load. Determine the deflection of the second spring under the simila

Dust collector, Dust Collector:             Dust collector system is to...

Dust Collector:             Dust collector system is to collect the blast burrs or waste particle created during the blasting process. During the blasting process, this dust co

Evaluate the angular velocity, In a 4-Bar process the following data is giv...

In a 4-Bar process the following data is given :- Length of crank (AB) = 300 mm, Length of link AD = 600 mm, Length of links BC = CD = 360 mm, Angle BAD ie ∠BAD = 60o ,

Equation for principal stresses and principal planes, Equation for principa...

Equation for principal stresses and principal planes: Derive equation for principal stresses and principal planes for the element subjected to compound stresses. Sol.:

Predict the output of load - curved beam theory, A load cell based on a "pr...

A load cell based on a "proving ring" is shown below.  The circular portion of the load cell has an inner radius of 1.25 in and outer radius of 1.50 in.  The ring has a depth (i.e.

Machine drawing, Sketch neatly two views of a footstep braring for supporti...

Sketch neatly two views of a footstep braring for supporting a 50mm diameter vertical shsft. Give important dimensions

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd