Process adjustment and process capability, Operation Management

Process Adjustment and Process Capability

Process adjustment

In the event of the process veering towards non-conformance as a result of variables which are not inherent to the process (assignable causes, see later), SPC can indicate the amount of the adjustment of the process required to re-establish control.

Process capability

In addition to providing real-time control of the process, the statistical analysis can provide an index which relates the inherent variability of the process output to the associated design tolerance band. The index number indicates the extent to which the process is capable of producing conforming output.

Posted Date: 3/15/2013 5:05:24 AM | Location : United States







Related Discussions:- Process adjustment and process capability, Assignment Help, Ask Question on Process adjustment and process capability, Get Answer, Expert's Help, Process adjustment and process capability Discussions

Write discussion on Process adjustment and process capability
Your posts are moderated
Related Questions
Need help with a paper? Prepare a 700- to 1,050-word paper in which you define the four functions of management (planning, organizing, leading, and controlling). In your paper,

1)?An analysis of type of operations carried out and operating processes (i.e., project, batch, mass, professional service, service shop,?mass service, etc.) 2)?An identification

Which of the following statement concern sexual orientation is true/ 1.sexual orientation is protected by the eeoc/ 2.attitude toward gays a in the workplace are not changing signi

A product is currently made in a job shop, where fixed costs are $4,500 per year and variable cost is $10 per unit. The firm sells the product for $70 per unit. What is the break-e

Question 1: Illustrate the different types of stores layout Free-Flow Layout Grid Layout Loop Layout Spine Layout Question 2: Describe the ingredient

Distinguish between management information systems and operations information systems

Twenty-five samples of size thirty (30) were collected and a total of 48 nonconforming items were found yielding p-bar = 0.064. The three sigma upper control limit (UCL) for a p co


Your company, ABC Company, uses 100% inspection for all materials and requires zero defect quality of all its vendors. If bad parts are found, it cost $1.00 per part to inspect the

The graph that plots the utility value versus monetary value is called a