LPP Sum, Operation Research

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper in a week. There are 160 production hours in a week. It requires 0.20 and 0.40 hours to produce a ton of grade X and Y papers. The mill earns a profit of Rs. 200 and Rs. 500 per ton of grade X and Y paper respectively. Formulate this as a Linear Programming Problem.
Posted Date: 2/21/2013 11:45:49 AM | Location : USA







Related Discussions:- LPP Sum, Assignment Help, Ask Question on LPP Sum, Get Answer, Expert's Help, LPP Sum Discussions

Write discussion on LPP Sum
Your posts are moderated
Related Questions

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Step 1: Research Towers of Hanoi problem The Towers of Hanoi is a problem frequently used to teach recursive programming techniques. Step 2: Run the assembly code from Hanoim

3. A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y pape

INFORMATION AND OTHER RELATED CONCEPTSĀ - THEIR MEANING AND CHARACTERISTICS: You may often hear or read in newspapers and other popular magazines aboutĀ "exponential growth of i

Maximize Z = 2x - 7y subject -2x + 3y = 3 4x + 5y >= 10 6x + 7y 4x + 8y >= 5

regression line drawn as y=c + 1075x, when x was 2, and y was 239, given that y intercept was 11. calculate the residual

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used to do the job. If a mac