lpp., Operation Research

Paper Mill Produces Two Grades Of Paper Viz x And y Because Of Raw Material Restrictions It Cannot Produce More Than 400 Tons Of Grade x Paper And 300 Tons Of Grade y Paper In a Week There Are 160 Production Hours In a week.it requires 0.20 and 0.40
Posted Date: 2/13/2013 6:48:35 AM | Location : USA







Related Discussions:- lpp., Assignment Help, Ask Question on lpp., Get Answer, Expert's Help, lpp. Discussions

Write discussion on lpp.
Your posts are moderated
Related Questions

Statement of Hypothesis The  two hypothesis  i  ,e,  null hypothesis  (H 0 ) and Alternative Hypothesis (H 1 ) are so  constructed  that if  one is  correct the other  is wron

A DRUG MANUFACTURER produces 2 products X1 and X2.X1 needs 2 hours on machine A AND 2 HOURS ON MACHINE B.X2 needs 3 hours on machine A and 1 hour on machine B.If machine A can run

Problem based on graphical solution of a given LPP when feasible region is bounded. 1.    Solve the following linear programming graphically; Maximize and minimize z = 60x+

Ask question #Minimum 100 words acceptNas food produces to kinds of popular dark chocolate bars. the banana and coffee. the banana bar costs 0.22 to make and sells of 0.35, where a

Panel Sampling Here the initial  samples are down  on random  basis  and information  from  these is collected  on regular  basis. Itis  semi permanent sample where members may

Normal 0 false false false EN-IN X-NONE X-NONE

What is meant by a mathematical model of a real situation? Discuss the importance of models in the solution of Operations research problems

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

ABC Company manufactures both interior and exterior paints from 2 raw materials M1 and M2. The following table gives basic data of problem.     Exterior