line balancing, Operation Research

what happen if line balancing does not exist
Posted Date: 2/10/2013 11:14:24 PM | Location : USA





Line Balancing
- Line: an assembly line composed of various work stations, at which particular operations are performed.

- To work efficiently, with no work pile-ups between stations, the line must be balanced, for example work must get through each workstation in roughly similar amount of time.
Goals:
1. To meet production goals,
2. Maximize output.

General Approaches to Line Balancing Technique
1. Estimating number of operators for a specific number of stations,
2. Work element sharing: grouping “activities” each work elements into “stations” or jobs performed by a single person (occasionally multiple people work in concert at a single station or machine)
Posted by james | Posted Date: 2/12/2013 7:09:54 AM


Related Discussions:- line balancing, Assignment Help, Ask Question on line balancing, Get Answer, Expert's Help, line balancing Discussions

Write discussion on line balancing
Your posts are moderated
Related Questions
Tentative explanations when formulated as propositions are called hypotheses. It is very important to state the hypothesis and its anticipated consequences before star

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2

if one no. is repeated 2-3 times in machine-1 and machine-2 what is to be prefer first

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i

Use  of the Graphs a . It simplifies  the complexities of large numbers  or that of  large mass  of data. In general  graphical  or some  other method or representation  is ad

Problems based on LPP when feasible region is unbounded.     1.    Minimize z = 3x + 5y subject to constraints  X + y ≥ 2 X + 3y ≥ 3 X, y ≥ 0 script

Model building is the essence of the operations research approach? Discuss. question #Minimum 100 words accepted#

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

. Explain in brief the phases of Operations Research. 5 +5 = 10 marks (200 - 250 words each) Q3. Solve the following Linear Programming Problem using Simple method. Maximize Z= 3

Assumption of F- Test The  theoretical assumption on which  F test  is based are: 1.The populations for  each sample must  be normally  distributed  with  identical  mean