line balancing, Operation Management

what do you understand by line balancing what happens if balance doesn''t exist
Posted Date: 2/9/2013 6:57:04 AM | Location :





Assembly Line Balancing
Line Balancing and Work Cell Balancing is an effective tool to increase the output of the Assembly line and Work Cell line to reduce manpower and cost. Assembly Line Balancing is nothing but the Simple Line Balancing is the calculation of assigning works to workstation alongside an Assembly Line and that operation will be optima in sense. Henry Ford who introduced the Assembly Line Balancing and in early times it was simple line balancing (LB) which has optimized the industrial importance, the effective difference between the optimal and sub-optimal operation can afford savings which will be million dollars every year.
Line Balancing: it is a Classical Operation Research (OR) which optimizes the problem, and it has been handled by OR for many decades. Most of the algorithms have been proposed to this problem and it contempt the usual importance of the issue and the OR use to handle this. It’s commercial software which is available to optimize the industry and their lines.
Assembly Line Balancing is dependent on 3 models and it is described that these 3 kinds of models is related to Assembly Line Balancing and they are Single-Model Assembly lines, mixed models, and multi-model Assembly lines.
Singe-Model Assembly Line: in early times assembly lines were used in high level production of a single product. But now the products will attract customers without any difference and allows the profitable utilization of Assembly Lines. An advanced technology of production which enables the automated setup of operations and it is negotiated time and money. Once the product is assembled in the same line and it won’t variant the setup or significant setup and it’s time that is used, this assembly system is called as Single Model Line.
Mixed Model Assembly Line: in this model the setup time between the models would be decreased sufficiently and enough to be ignored. So this internal mixed model determines the assembled on the same line. And the type of assembly line in which workers work in different models of a product in the same assembly line is called Mixed Assembly Line.
Multi-Model Assembly Line: in this model the uniformity of the assembled products and the production system is not that much sufficient to accept the enabling of the product and the production levels. To reduce the time and money this assembly is arranged in batches, and this allows the short term lot-sizing issues which made in groups of the models to batches and the result will be on the assembly levels.

Posted by Diana | Posted Date: 2/12/2013 7:28:25 AM


Related Discussions:- line balancing, Assignment Help, Ask Question on line balancing, Get Answer, Expert's Help, line balancing Discussions

Write discussion on line balancing
Your posts are moderated
Related Questions
explain the monte carlo simulation

1. Propose a definition of innovation in your own words (50-100 words). 2. Compare the concepts of innovation, invention, and creativity. 3. Describe the relationship between

1. Please explain, in detail, the strategic issues both external and internal that Whole Foods' faces. 2. Please explain, in detail, the strengths, weaknesses, opportunities and th

Please give a detailed explanation for the answer for the following scenario: You are a division manager of a manufacturing facility that produces waste? Water that must be treated

In your own organisation find an example where break-even analysis is/could be applied.

Merits of Continuous or Flow Production 1.The direct labor content will be reduced since the comprehensive pre planning which is necessary will often produce economies in time.

A refinery in Houston replaces all of the 3" full-open ball valves in its facility according to a very strict maintenance policy which spaces replacements fairly uniformly througho

A small computer firm orders monitors for sale. The annual demand is 1300 per year. The holding cost is 10 percent of the value of the monitors on hand. Each time they order it cos

Orange Company is allocating its advertising budget for its new smartphone targeting graduate and undergraduate students in RTP. The company has invited representatives from the lo

Weekly tasks or assignments (Individual or Group Projects) will be due by Monday and late submissions will be assigned a late penalty in accordance with the late penalty policy fou