Line balancing, Operation Management

What do you understand by “line balancing”? What happens if balance doesn’t exist
Posted Date: 2/5/2013 2:41:59 AM | Location : USA





Line Balancing
- Line: an assembly line composed of various work stations, at which particular operations are performed.

- To work efficiently, with no work pile-ups between stations, the line must be balanced, for example work must get through each workstation in roughly similar amount of time.
Goals:
1. To meet production goals,
2. Maximize output.

General Approaches to Line Balancing Technique
1. Estimating number of operators for a specific number of stations,
2. Work element sharing: grouping “activities” each work elements into “stations” or jobs performed by a single person (occasionally multiple people work in concert at a single station or machine)
Posted by John | Posted Date: 2/12/2013 7:11:10 AM


Related Discussions:- Line balancing, Assignment Help, Ask Question on Line balancing, Get Answer, Expert's Help, Line balancing Discussions

Write discussion on Line balancing
Your posts are moderated
Related Questions
What are the disadvantages of periodic systems for controlling inventory? The disadvantages of periodic while compared to continuous systems for controlling inventory are as fo

Give an example of ethical leadership. What are the characteristics of ethical leadership? And why do you think ethical leadership is important.


The number of visitors at a theme park by season and year has been recorded and is given in the following table: Quarter 2003 2004 2005 2006 Winter 45 46 35 16 Spr


Question 1: More and more organizations are showing greater reliance on team building and team work as opposed to individual work. Please discuss. i. Give characteristics o

Describe the framework of the general model of planned change. Include a discussion of each activity and a typical sequence of events.

Which of the following is normally not addressed in a change control board meeting to approve a scope change? Answer Cost of the change Which functional unit will perform

Pretend you are attending a college if you are not and answer the following questions. Putting together college classes for a given term is no mean problem in production scheduling

types of manufacturing system and layout