job sequencing problem, Operation Research

on which basis we take value in time out time in column?
Posted Date: 9/9/2012 1:31:09 AM | Location : United States







Related Discussions:- job sequencing problem, Assignment Help, Ask Question on job sequencing problem, Get Answer, Expert's Help, job sequencing problem Discussions

Write discussion on job sequencing problem
Your posts are moderated
Related Questions
A FIRM MANUFACTURES HAEDACHE PILLS IN TWO SIZE A AND B

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

represent a diagrammatic way of components of the os

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

CONSIDER A BARBER SHOP WITH ONE CHAIR, ONE BARBER AND NO ROOM FOR CUSTOMER TO WAIT. IF THE CHAIR IS EMPTY WHEN THE CUSTOMER ARRIVES,HE ENTER THE SHOP AND HIS HAIR CUT BEGINS. IF TH

minimization

Festinger and Katz have described followings six steps in the conduct to a field study. a. Preliminary Planning :Deciding scope and objectives of study and the time table

Discuss the methodology of operation research

QUARTILES The three points on the scale  of observation ( or  values  of the variable) which  divide  the total  frequency  into four  equal  parts are called  quartiles for t

A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y paper i