Computing equivalents units and assigning costs to completed units and ending work in process; no beginning inventory or cost transferred in (30 -45min)

Sue Electronics makes CD players in three processes: programming, and packaging. Direct materials are added at the beginning of the assembly process. Conversion costs are incurred evenly throughout the process. The Assembly Department had no work in process on March 31. In mid - April, Sue Electronics started production on 100,000 CD players. Of this number, 76100 CD players were assembled during April and transferred out to the Programming Department. The April 30 work in process in the Assembly Department was 40% of the way through the assembly process. Direct materials costing $375,720 were positioned in production in Assembly during April, and direct labor of $157,700 and manufacturing overhead of $98,595 were assigned to that department.

Requirements

1. Draw a time line for the Assembly Department.

2. Use the time line to assist you computes the number of equivalent units and the cost per equivalent unit in the Assembly Department for April.

3. Assign total costs in the Assembly Department to (a) units completed and transferred to Programming during April and (b) units still in process at April 30.

4. Prepare a T - account for Work in Process Inventory - Assembly to show its activity during April, including the April 30 balance.estion..

Related Discussions:- Help

Explain prerequisites of a sound variances analysis system, Prerequisites o...

Prerequisites of a sound variances analysis system A variance analysis system would be good enough in controlling costs and evaluation performances if the following requirement

Multiple regression, MULTIPLE REGRESSION The least square regression eq...

MULTIPLE REGRESSION The least square regression equation discussed above was based on the assumption that total cost was determined by only one activity based variable. However

Projected balance sheet method, In this method, approximation of various as...

In this method, approximation of various assets here excluding cash and including liabilities are made getting into consideration the transactions in the ensuring period. Afterward

What is ratio analysis, Ratio analysis A ratio is a simple arithmetical...

Ratio analysis A ratio is a simple arithmetical expression of the relationship of one number to another. It may be explained as the indicated quotient of two mathematical ex

What is the scope of waste heat boilers, What is the Scope of Waste heat bo...

What is the Scope of Waste heat boilers This specification covers the minimum requirements for the design, material selections, fabrication, testing and inspection of shop- / o

Capital budgeting – planning investments, Project C would involve a current...

Project C would involve a current outlay of $50,000 on equipment and $15,000 on working capital. The investment in working capital would be increased to $21,000 at the end of the f

Explain the techniques of performance budgeting, Explain the techniques of ...

Explain the techniques of performance budgeting It will also be useful to examine the three major aspects of this technique: Structural aspects : the structural aspects inv

Financial management, discuss the applicability of an operating cycle in ve...

discuss the applicability of an operating cycle in vegetable growing in a low developed country like Uganda- Africa

Flexible budgeting, FLEXIBLE BUDGETING Flexible budget may be used in one ...

FLEXIBLE BUDGETING Flexible budget may be used in one of two ways: Planning and Control. At the planning stage when budgets are set, to reduce the effect of uncertainty. For ex

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd