Goals of quality control, Software Engineering

Describe how the goals of quality control (QC) flexible manufacturing systems (FMS), design for assembly (DFA)and low overall costs can be best combined by computer integrated manufacturing (CIM) system include in this discussion the interrelation of , computer numerical control (CNC)computer aided design (CAD), the decision support system (DSS)and computer aided process planning (CAPP), with these objectives.

Posted Date: 2/22/2013 6:22:49 AM | Location : United States







Related Discussions:- Goals of quality control, Assignment Help, Ask Question on Goals of quality control, Get Answer, Expert's Help, Goals of quality control Discussions

Write discussion on Goals of quality control
Your posts are moderated
Related Questions
What are Quality reviews? This is the principal method of validating the quality of a process or of a product. A group examines part or all of a process or system and its do

Advantage of software package: Advantages accrue from this situation. Some of these are mentioned below:  i)  An efficient software package requires at least 4 to 5 man yea

Explain Spiral model The spiral model is separated into number of frame works. These frameworks are indicated by task regions. Usually there are six task regions. In spir

Determine the Software development models Software Engineering deals with development of software. Thus, understanding the basic characteristics of software is essential. Softw

What is Quality assurance and standards? Standards are the key to efficient quality management. They may be international, national, and organizational or project standards.

Can I punch the big jizz daddy on the Bongo machine?

A manifestation of an error in software. A fault, if encountered, might cause a failure.

Define black box testing strategy. Black box testing describes the functional requirements of the software. Test cases are determined on the basis of the requirements or specif

Question 1: a) Describe the various activities and or processes related to the development of Information systems. b) Using a diagram, show the several development processes

Explain the term - Code Complete - Phase of development where functionality is implemented completely with only bug fixes remaining. - All functions from functional specific