Gis for distribution network management, Electrical Engineering

Gis for Distribution Network Management:

You are well aware of the problems facing the distribution utilities to meet the day-to-day requirements of the power consumers, like as system management for quality power with minimum losses, monitoring of AT&C losses, optimum inventory management, managing a proper customer complaints and grievance system, effective workforce utilization, etc. The day- to-day challenges before distribution utilities in the country include lack of updating of dynamic data uniformly throughout the utility (since data is created by meter readers/line men), lack of correct consumer data base, non- availability of MIS for middle and top management, that leads to faulty planning, consumer hardships and revenue leakages, non-feasibility of energy audit, delays in project implementation, etc. therefore, utilities urgently required to address issues such as

1  Non-availability of network information, and consumer and technical database;

2  Non-existence of regular updating system;

3  Non-availability of any IT-enabled tool to provide the required analytical reports correctly and quickly; and

4  Non-existence of records of day-to-day changes in the system.

The distribution company cannot work efficiently and economically without the availability of consumer and technical database as analysis and improvement of the system will not be possible.

Posted Date: 2/8/2013 6:23:48 AM | Location : United States







Related Discussions:- Gis for distribution network management, Assignment Help, Ask Question on Gis for distribution network management, Get Answer, Expert's Help, Gis for distribution network management Discussions

Write discussion on Gis for distribution network management
Your posts are moderated
Related Questions
Q. Draw a centralized SPC organization. Ans: A dual processor architecture can be configured to operate in one of three modes: (i)  Standby mode (ii)  Synchronous dupl

Q. Use of N-channel JFET? Generally, N-channel JFETs are more commonly used than P-channel. With no voltage applied between gate and source, the channel is a wide-open path for

research paper on gauss,s law?

For  Sign  Flag JP ( jump  on plus ) Jump  on minus ) Instructions JP  transfer  the execution of the program to the specified  memory  address if  sign  flag is set (S=

State the different stabilization techniques and compensation techniques

Hi, i''ve been given this task: You are required to design a multi-stage audio amplifier with the following specification: Voltage gain 250 Input resistance 200 kOhm Output resi

Q. For the circuit of Figure, determine and sketch i L (t) and vC(t) for inductance values of (a)3/4 H, (b) 2/3 H, and (c) 3/17 H. Note that the inductance values are chosen her


A three-phase, wye-connected, cylindrical-rotor synchronous generator rated at 10 kVA and 230  V has a synchronous reactance of 1.5per phase and an armature resistance of 0.5  pe

Q. What effect do non-tradable goods have on PPP? Answer: The consequence is quite substantial. In 1997 the production of non-tradable goods accounted for about 55% of U.S GN