Explain what is the multifactor productivity for each system, Operation Management

Assignment Help:

A grocery chain is considering the installation of a set of 4 self-checkout lanes. The new self-checkout lane setup will replace 2 old cashier lanes that were staffed by a cashier and bagger on each lane. One cashier mans all 4 self-checkouts (answering questions, checking for un-scanned items, taking coupons, etc). Checkout on the new lanes takes 2 minutes (customers bag their own orders) while checkout with the old lanes took only 45 seconds. In addition the electricity costs for both setups are $.05 per checkout while bagging (material) costs are $.10 per checkout with the old system and $.15 for the new system. The new lanes also require $100 in capital costs. Assume that the new lanes ar always in use for 8 hours per day (1 shift) and that a worker makes $10.00/hour. What is the multifactor productivity for each system?


Related Discussions:- Explain what is the multifactor productivity for each system

Explain what order should these jobs be done, A machine shop has two machin...

A machine shop has two machines, M1 and M2. Four jobs A, B, C, and D need to be processed through machines M1 first and M2 second. Job A will take one hour on machine M1 and three

Explain are restatements of the law written, Are restatements of the law wr...

Are restatements of the law written and revised by congress and state legislatures true or false

Memorandum, You are the operations manager and in this capacity, you have b...

You are the operations manager and in this capacity, you have been asked to provide a location analysis on whether your company should expand an existing manufacturing plant or clo

Explain compensated for the loss in purchasing power, Fourteen years ago, t...

Fourteen years ago, the U.S. Aluminium Corporation borrowed $9.9 million. Since then, cumulative inflation has been 98 percent (a compound rate of approximately 5 percent per year)

Linear programming problem, Explain the graphical method of solving Linear ...

Explain the graphical method of solving Linear Programming Problem

Explain customization and volume and process., The product-process matrix u...

The product-process matrix used to analyze manufacturing operations brings together the elements of: a) Customization, volume, and process. b) Volume, process, and intensity.

Explain does anyone have any insight, Does anyone have any insight into Dis...

Does anyone have any insight into Discussion Question, This was not discussed in class.

Tangibles - customer satisfaction and service quality, Tangibles - Customer...

Tangibles - Customer Satisfaction and Service Quality Include the physical evidence of the service: physical facilities, appearance of personnel, tools or equipment used to pr

Explain future trends in advertising, Either through research or through im...

Either through research or through imagination, describe future trends in advertising?

What is benchmark for future comparison, Cunningham Performance Auto, Inc.,...

Cunningham Performance Auto, Inc., modifies 375 autos per year. The manager, Peter Cunningham, is interested in obtaining a measure of overall performance. He has asked you to prov

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd