Explain the reuse maintenance model, Software Engineering

Assignment Help:

Q. Explain the reuse maintenance model with the help of a diagram.

Ans: Recycle maintenance model this model is based on the principal that maintenance could be viewed as an activity involving the reuse of existing program components

The recycle model has four main steps:

1. The Identification of the parts of the old system that are candidates for reuse.

2. The Understanding of these system parts.

3. The Modification of the Old system parts appropriate to the new requirements.

4. The Integration of the modified parts into the new system.

With the five recycle model the starting point may be any phase of the life cycle. The design, the requirements, the code or the test data: - distinctly other models.

1721_Explain the reuse maintenance model.png


Related Discussions:- Explain the reuse maintenance model

How is software design different from coding, How is software design differ...

How is software design different from coding ? Points of difference among software design and coding can be laid down as under:  Design : 1. Design is most vital and t

What is constant, What is Constant? In software or software testing, a c...

What is Constant? In software or software testing, a constant is a meaningful name that shown a number, or string, that does not alter. Constants are variables that remain the s

Software testing, 1. Answer the following questions for the method search()...

1. Answer the following questions for the method search() below: public static int search (List list, Object element) // Effects: if list or element is null throw NullPointerExcept

What is software fault, Software faults are unseen programming errors. Soft...

Software faults are unseen programming errors. Software faults are errors in the correctness of the semantics of computer programs.

What is up time, What is Up time? "Up time" is the time period when a me...

What is Up time? "Up time" is the time period when a method is operational and in service. Up time is the sum of idle time and busy time.

Explain the steps used in in system analysis, Question 1 A) If you are a s...

Question 1 A) If you are a software engineer you must be expert in the field of hardware, software  and also database. It has been listed by the industry professionals that time a

Explain the throw away prototype, Explain the Throw away prototype I...

Explain the Throw away prototype In this technique, prototype is discarded once its purpose is fulfilled and final system is built from scratch. Prototype is built quickly t

What is verification, What is verification?     Verification is the pro...

What is verification?     Verification is the process of determining whether the output of single phase of software development conforms to that of its last phase, whereas vali

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd