Question 1:
a. What are the Facets of Component that you know about ?
b. Explain the CORBA component Model types ?
c. Talk about the three concepts that you should keep in mind when designing for Reusability ?
Question 2:
a. Software engineers need to be skilled in estimation and measurement. What does that mean?
b. The Goal Question Metric approach, defined by Basili et al., is a structured, valuable, and widely accepted method for answering the question of what to calculate. Briefly, the GQM drives the definition of a metrics program from the top down. What are they ?
FAST stands for :- FAST :- Facilitated Application Specification Technique
what is concurrency?
State the term- Code Coverage This is an analysis method that determines which parts of software have already been covered by test case suite and which are remaining.
What is Requirement Traceability? Explain its importance. Requirement Traceability is mapping of needs to test cases. There are two major traceability: Forward and Backward. It
Q. How is software design different from coding? Ans: Points of difference among software design as well as coding can be laid down as under: Design : 1. Design is mo
Documentation specifying the scope, approach, resources, and schedule of intended testing activities. It signifies test items, the features to be tested, the testing tasks, respons
Fan in/Fan-out :- Fan-in is a measure of the number of process or functions that call some other function or process (say X). Fan-out is the number of functions that are known
Problems and feasibility study
a) Define Annual Change Traffic (ACT) and Annual Maintenance Effort (AME) of Boehm model. b) For a software system of 90 KLOC, 5KLOC of code was added. The initial development
What is the difference between Test Plan and Master Test Plan. Master Test Plan - i.) It is mandatory in all projects. ii.) It provides strategy to be used to test the
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd