Explain some important points for hazardous waste, Civil Engineering

Assignment Help:

Explain some Important Points for Hazardous Waste

  • The mixture rule prevents dilution of waste for the purposes of escaping RCRA regulation. Mixtures of a listed hazardous waste and other solid wastes become hazardous wastes.
  • The "contained in" rule is a direct consequence of the mixture rule. In this policy media such as soil and water are treated as hazardous waste if they contained listed hazardous materials
  • The "derived from" rule tells us that any solid waste generated from the treatment, storage, or disposal of a hazard waste, including any sludge, spill residue, ash, emission-control dust, or leachate (but not precipitation run-off) is a hazardous waste.
  • The "waste-code carry through" principle is a consequence of both the "derived from" and "mixture" rules. It states that solid waste derived from a hazardous and nonhazardous waste contains all of the same waste codes as the original waste.

 


Related Discussions:- Explain some important points for hazardous waste

Hiley formula in designing of h-piles, Question Is it resourceful that ...

Question Is it resourceful that engineers rely solely on Hiley's formula in designing of H-piles? Answer About 90 percent of H-piles accept Hiley's formula for desig

Types of pavements, Types of Pavements: On the basis of structural pe...

Types of Pavements: On the basis of structural performance of pavements, there are basically two types of pavements: (a) Flexible, and (b) Rigid. A flexible pavement

Resultant pull, two locomotive moving on opposite bank of a canal can pull ...

two locomotive moving on opposite bank of a canal can pull a vessal parallel to the banks by the means of two rope.the force in the ropes are 20kN and 24kN while the total angle be

Flow, what is maximum flood level

what is maximum flood level

Explain the components of a rebound hammer, Explain the Components of a reb...

Explain the Components of a rebound Hammer? Several components of a rebound hammer are displayed in below Figure. 1. Concrete surface; 2. Impact spring; 3. Rider on gui

Determining the amount of pre-camber, 1. Domes - You are a construction man...

1. Domes - You are a construction manager in the UAE in charge of a project that involves constructing domes.  Discuss briefly, giving examples, a range of different types of dome

cement, what is the manufacturing process of regular portland cemen

what is the manufacturing process of regular portland cement

Timber, what are the defects in timber

what are the defects in timber

Cantilever support reactions, A cantilever has two couples: 1st(clockwise, ...

A cantilever has two couples: 1st(clockwise, 15kNm) placed at (1/3)L from support and 2nd (anti-clockwise, 10kNm) at (2/3)L from the support. What should be the reaction at the sup

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd