Estimate the size estimating the rcc structures, Civil Engineering

PART - A

1.  Can you enumerate the benefits of individual wall method of estimation?

2.  Estimate the single room of size  3m x 4m x height 3m  using individual wall method?

3.  Which method you will choose - center line method or individual wall method for estimation of buildings?

PART - B

4.  Write the parameters you should keep in mind while estimating the RCC structures?

5.  A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?.

6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.

 

Posted Date: 3/1/2013 7:19:47 AM | Location : United States







Related Discussions:- Estimate the size estimating the rcc structures, Assignment Help, Ask Question on Estimate the size estimating the rcc structures, Get Answer, Expert's Help, Estimate the size estimating the rcc structures Discussions

Write discussion on Estimate the size estimating the rcc structures
Your posts are moderated
Related Questions
construction of arches

Q. What are the various impurities in water? Ans.- Impurities in water - The impurities in water are classified as - i. Suspended Impurities. ii. Colloidal Impuritie

Explain briefly shallow foundation?

Presence of bridge piers across a stream causes constricted flow in the openings due to the decrease of width of stream owing to presence of the piers. Furthermore it creates the f

Skid resistance of wearing course Skid resistance of wearing course in a bituminous pavement is contributed by macro texture (which implies the general surface roughness) and

What are Aquifers? Water bearing, underground geologic formations. The subsurface formations are composed of soils and rocks with voids saturated with water.


The two plates shown below are each 10-in. wide by ¾- in. thick. The gage distance, g, and the longitudinal spacing on each member is set at 4-in. Determine the axial strength of t

Define Wastewater treatment Processes The wastewater treatment processes that we design mimic the processes that occur in the nature (for example processes that occur in a flow

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc