Detonation equation for this mixture, Econometrics

1. Consider a mixture of one mole of Nitroglycerin and one mole of Ammonium Nitrate

a. Write the detonation equation for this mixture

b. Using class notes, posted articles in Courseworks site and other resources calculate the energy released (kJ/kg) by this reaction. Show your steps and assumptions in this calculation.

2. Five soil samples (A,B, C, D, E ) have been analyzed for their grain size distribution shown as straight lines on the cumulative probability plot below

Identify each one of these using the attached PRA classification chart. In each case explain your method and show how you reached these answers.

3. Investigate by the slip circle technique the stability of the bank shown below. Assume that a slope failure most likely to occur. The condition selected is considered to be the worst case. Analyze, and determine the factor of safety for:

a) Dry soil

b) Saturated soil

c) What would be the maximum weight of a building on top is permissible under dry soil conditions for a factor of safety of 1.5?

Use the following inputs:

Soil specific weight                                 220 lb/ft3

Soil cohesion                                        250 lb/ft2

Soil internal friction angle                       30 o

Pit slope                                               40 o

Bank height                                          60 ft

Radius of slip circle                               80 ft

Building weight ? tons (no building is considered initially)

Posted Date: 3/1/2013 4:27:44 AM | Location : United States







Related Discussions:- Detonation equation for this mixture, Assignment Help, Ask Question on Detonation equation for this mixture, Get Answer, Expert's Help, Detonation equation for this mixture Discussions

Write discussion on Detonation equation for this mixture
Your posts are moderated
Related Questions

Consider a linear model to explain pricing of houses: Price = ß0 + ß1lotsize + ß2sqrft + ß3bdrms + u (1) E(u| lotsize, sqrft, bdrms)=0 Var (u| lotsize, sqrft, bdrms)=s2 lotsize4

I have a project and I need help with the writing. I have the data and the SPSS regression, park test

reasons of lags

Suppose years of schooling, s , is the only variable that affects earnings. The equations for the weekly salaries of male and female workers are given by w m = 500 + 100 s and

You are a property insurer and one of your potential clients, whose current wealth is $450,000, wants to insure her $250,000 house.  The chances of the house burning down in any gi

(a) Describe all tests that you need to undertake prior to working with time series data. (b) Consider the following regression result: Standard Errors: (6.7525)

write a term paper on modelling and multicollinearity

Need to run MGARCH (system) in SAS or other software. Have data.

An electron follows a helical path in a uniform magnetic field of magnitude 0.422T. The pitch of the path is 6.81 mm, and the magnitude force on the electron is 1.59 x 10 -15 N. W