Determine net work done:

5m3 of air at 2bar, 270C is compressed to 6bar pressure following PV1.3  = constant. It is expanded subsequently adiabatically to 2 bar. Considering two processes to be reversible, determine net work done, and also plot the processes on T - S diagrams.                                                                                                                                        

Sol:  V1 = 5m3, P1  = P3 = 2bar, P2  = 6bar, and n = 1.3

V2 = V1(P1/P2)1/1.3  = 5(2/6)1/1.3  = 2.147m3

Thus work done during process 1 - 2 is W1-2

= (P2V2  - P1V1)/(1- n)

= (6 × 105  × 2.47 - 2 x 105  × 5)/(1-1.3) = - 9.618 × 105  J

Likewise to obtain work done during processes 2 - 3, we apply

W2-3 = (P3V3  - P2V2)/(1 -   ); where      = 1.4

And V3 = V2(P2/P3)1/   = 2.147(6/2)1/1.4  = 4.705m3

2230_Determine net work done.png

199_Determine net work done10.png

 

Posted Date: 10/15/2012 9:03:18 AM | Location : United States







Related Discussions:- Determine net work done, Assignment Help, Ask Question on Determine net work done, Get Answer, Expert's Help, Determine net work done Discussions

Write discussion on Determine net work done
Your posts are moderated
Related Questions
Clutch cable model: Ensure the cables fitted are of the respective model and not interchanged with other model. Also ensure that the cable is genuine.

Estimate the Weight of the Casting A Yoke casting shown in Figure is to be produced by sand casting process. Estimate the weight of the casting if the density of the material

the component of computer integrated manufacturing with the diagram

Operation and maintenance of airport facilities: The operation and maintenance of airport facilities is very important for ensuring safety, convenience and economy. Air Traffi

Shear force and bending moment diagram: How can you draw a shear force and bending moment diagram. Sol.: In these diagrams, the Shear Force or bending moment are repr


how I can formulate mathematically the risk management in demand uncertainty of short life cycle product.

Cell Control And Modeling   Various numbers of modeling systems and cell control have been developed to date. Researchers have worked many on three broad regions: scheduling;

sir, you are doing such a great thing.but my suggestion is that please u put some engineering problems to solve. for engineering student like me.

Sliding and Rolling Consider the following example. A cylinder of mass  M  and radius  R  is held at rest on a plane inclined at an angle to    to the horizontal. When the cyl