Design of work systems, Operation Management

A worker machine operation was found to involve 3.5 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The workers time averaged 2.3 minutes per cycle and the worker was given a rating of 120 percent(machine rating is 100 percent). Mid way through the study, the worker too a 10 minute rest break. Assuming an allowance factor of 11 percent of work time, determine the standard time for this job course not round intermediate calculation. Round your final answer to 2 decimal places.
Posted Date: 10/29/2012 11:33:44 PM | Location : United States







Related Discussions:- Design of work systems, Assignment Help, Ask Question on Design of work systems, Get Answer, Expert's Help, Design of work systems Discussions

Write discussion on Design of work systems
Your posts are moderated
Related Questions
Using terms from this chapter, how would you characterize the teams at ICU Medical Inc.? What are some advantages and disadvantages of giving teams a lot of autonomy to make decisi

what are the key issues to be considered when managing global management operations

Why is it important to develop their products/services marketing plan in writing?

The 3M incorporate produces solar cell panels, and the production rate can be 8,000 pieces per day. The demand for the solar panel is 30,000 pieces per month. The fixed cost of set

If you believe that urine testing in some form might be acceptable, write down the outlines of sound testing program. Who should be tested? Employees? Job applicants? Should there

Imagine that you are beginning the very first social networking site, fast-food restaurant, or pizzeria, and develop a brief business plan that highlights the financial, marketing,

Please give a detailed explanation on the following scenario: You are a swap dealer and know that XYZ County finance director is clueless about how to conduct interest rate risk ma

While patrolling for illegal border crossings and drug dealers, agents of the U.S. Border Patrol spotted 15 to 20 people being loaded into a van at the rear entrance to a restauran

Integrated solutions in product design and control of machinery are based on    CAD and CAM technologies.

A University Web server has five main components each with the same reliability. All five components must work for the server to function as intended. If the University wants to ha