Cpu scheduler, computer science, Basic Computer Science

Selects among the processes in memory which are ready to execute & allocates the CPU to one of them
CPU scheduling decisions can be taken place when a process:
A. Terminates
B. Switches from running to waiting state
C. Switches from running to ready state
D. Switches from waiting to ready
Scheduling under 1 & 4 is nonpreemptive
All other scheduling is preemptive
Posted Date: 2/15/2012 4:07:14 AM | Location : United States







Related Discussions:- Cpu scheduler, computer science, Assignment Help, Ask Question on Cpu scheduler, computer science, Get Answer, Expert's Help, Cpu scheduler, computer science Discussions

Write discussion on Cpu scheduler, computer science
Your posts are moderated
Related Questions
A router is a device which has played an important role in the development and existence of the Internet. Routers are designed to transmit data from other network users to specific

Liquid Crystal Displays (LCD): First introduced in watches and clocks in the1970's, LCDs are now used to display images in monitors. A newer technology in computer screens is

RANDOM ACCESS MEMORY (RAM): The RAM-type memory will allow data to be written into it, as well as read from it. With very few exceptions, RAMS lose their contents when the powe


A line holds only whitespace, probably with a comment, is identified as a blank line, and Python completely avoids it. In an interrelated interpreter session, you need to enter an

compare encoders and multiplers

1. The standard way for debuggers to plant breakpoints in a program in RAM (whatever the processor instruction set) is to save the breakpointed instruction and replace it by a jump

Scores from a statistics exam are reported as deviation scores. Which of the following deviation scores indicates a higher position in the class distribution?

design railway maintenance system. draw er diagram.

The geometric mean is obtained by multiplying all the four numbers and taking the fourth root of the product. Let x 1 ,x 2 ,x 3  and x 4  be the given four numbers then geometric