Concrete mix design, Civil Engineering

Concrete Mix Design:

Concrete mix design is done in a laboratory to achieve the desired strength and workability. The mix design is done to achieve strength slightly higher than the value assumed in the design to account for variations in quality during construction. The water cement ratio is kept low (less than 0.4) and workability is achieved by adding admixtures such as plasticisers.

Posted Date: 1/22/2013 4:56:43 AM | Location : United States







Related Discussions:- Concrete mix design, Assignment Help, Ask Question on Concrete mix design, Get Answer, Expert's Help, Concrete mix design Discussions

Write discussion on Concrete mix design
Your posts are moderated
Related Questions
Define the Coefficient of Permeability: (K) A measurement of the ability of the soil or an aquifer for the movement of water through it. Also termed "hydraulic conductivity", C

Analyse the state of stress at the critical section: A prismatic bar of circular section with 80 mm diameter is subjected to bending moment of 5 kN-m and a torque of 7 kN-m. A

size of steel truss for span of 5m

A retaining wall 9 m high retains granular fill weighing 18 kN/m 3 with level surface. The active thrust on the wall is 180 kN per metre length of the wall. The height of the wall

Concrete Mix Design: Concrete mix design is done in a laboratory to achieve the desired strength and workability. The mix design is done to achieve strength slightly higher t

Q. Show the Continuous Piezocone Penetration Test? Continuous piezocone penetration test essentiallycomprises standard cone penetration test and a measurement of pore water pre

What is the external load acting on a pre-stressed beam In the elastic range, a variation in the external load acting on a pre-stressed beam results in a change in the location

Q. How to evaluate quality of Bricks? 1. Clour -Deep red, Carry red, Copper red, colour is indication of uniform burning and also suggests quality of clay used. Over brunt bric

Obstacles which can be ranged

how to find the correction on leveling calculation