Assignment, Operation Management

What do you understand by “line balancing”? What happens if balance doesn’t exist?
Posted Date: 2/10/2013 4:48:24 AM | Location : USA





Assembly Line Balancing
Line Balancing and Work Cell Balancing is an efficient tool to increase the output of the Assembly line and Work Cell line to reduce manpower and cost. Assembly Line balancing is nothing though the Simple Line Balancing is the calculation of assigning works to workstation alongside an Assembly Line and that operation will be optima in sense. Henry Ford who was first introduced the Assembly Line Balancing and in early times it was simple line balancing (LB) that has optimized the industrial significance, the effective difference between the optimal and sub-optimal operation can afford savings that will be million dollars every year.
Singe-Model Assembly Line: in early times assembly lines were utilized in high level production of a single product. But now the products will draw customers with no any difference and allows the profitable use of Assembly Lines. An advanced technology of production which enables the automated setup of operations and it is negotiated time and money. One time the product is assembled in the same line and it won’t variant the setup or significant setup and it’s time that is utilized, this assembly system is called as Single Model Line.
LB: it is a Classical Operation Research (OR) which optimizes the problem, and it has been handled by OR for many decades. Several algorithms have been proposed to this problem and it contempt the usual importance of the issue and the OR utilizes to handle this. It’s commercial software which is available to optimize the industry and their lines.
Assembly Line Balancing is dependent upon 3 models and it is explained that these 3 types of models is related to Assembly Line Balancing and they are Single-Model Assembly lines, mixed models, and multi-model Assembly lines.
Multi-Model Assembly Line: in this type of model the uniformity of the assembled products and the production system is not that very much sufficient to accept the enabling of the product and the production levels. To decrease the time and money this assembly is arranged in batches, and this permits the short term lot-sizing issues which made in groups of the models to batches and the result will be on the assembly levels.
Mixed Model Assembly Line: in this model the setup time among the models would be decreased sufficiently and enough to be ignored. Thus this internal mixed model determines the assembled on the same line. And the type of assembly line wherein workers work in different models of a product in similar assembly line is called Mixed Assembly Line.
Posted by Alice | Posted Date: 2/12/2013 7:29:41 AM


Related Discussions:- Assignment, Assignment Help, Ask Question on Assignment, Get Answer, Expert's Help, Assignment Discussions

Write discussion on Assignment
Your posts are moderated
Related Questions
What are the advantages and disadvantages of using a Cause and Effect diagram and Pareto Analysis in terms of analyzing quality issues? Respond to at least two of your classmates'

Question 1: (a) Explain the specific steps you would take to ensure that an individual has the appropriate abilities to satisfactorily do a given job. (b) Explain  the four

1. Propose a definition of innovation in your own words (50-100 words). 2. Compare the concepts of innovation, invention, and creativity. 3. Describe the relationship between

When it is claimed that people that ‘pay' for wrongs are unfairly burdened and should not bear the responsibility for the acts of others, they are opposing to Answer reverse discri

Task 1 Read: Chapter 1 of the core learning material and supporting text book chapters which relate to Operations Management. Choose an organisation with which you are either in

Which one of the following is NOT one of the basic elements of the strategic management process A. Strategy formulation B. Strategy implementation C. Statistical process control D.

Oregon Productivity Matrix - Performance Measures The Oregon productivity matrix (OPM) was developed in Oregon State University in 1986 and measures accomplishments against go

FIVE ways in which an organisation might respond to variations in demand for its products. Five ways are:- Use of overtime working Use of part-time or casual labour Hi

neater eater hamburger joints frequency distribution operation research problem

Could someone show me how to do a Pareto chart based on the information in problem of mgmt production management?