Aerodynamics-supercritical aerofoils, Other Engineering

Design Features of Supercritical Aerofoil

• Blunt nose-

rapid p pressure reduction around leading edge

• Flat top-

Reduce the flow acceleration on upper surface toreduce shock strength

• Cusped trailing edge-

Increased loading over rear of aerofoil to recoversome lift 

 

Velocity vector

1146_velocity vector.png

Speed of NACA

1258_velocity vector1.png

Posted Date: 8/27/2012 1:55:40 AM | Location : United States







Related Discussions:- Aerodynamics-supercritical aerofoils, Assignment Help, Ask Question on Aerodynamics-supercritical aerofoils, Get Answer, Expert's Help, Aerodynamics-supercritical aerofoils Discussions

Write discussion on Aerodynamics-supercritical aerofoils
Your posts are moderated
Related Questions
Zero-Coupon Bond is a type of bond gives no periodic interest payments, instead is sold at a steep discount from its face value. Due to these bonds these do not pay interest until

Q. Describe briefly the following methods of forging :        (i) Drop forging        (ii) press forging Ans.  (i) Drop Forging: It is also called die

Define the aircraft axes & degrees of freedom. Analyse the different maneuvers that can be done by an aircraft.

How do you calculate IRR

• ''Discussed Since the promised return on Russian government debt is much higher than the promised return on US government debt, you should invest your money in Russia

Judy Johnson is choosing between investing in two Treasury securities that mature in five years and have par values of $1,000. One is a Treasury note paying an annual coupon of 5.

Explain different types of intakes of aircraft

what are the components, applications, benefits and drawbacks of control engineering?????

Uncertainty propagation In order to calculate the error of a quantity derived from a mathematical formula which has measured variables with errors, one should use the uncertain

Internal rate of return IRR In case of IRR method cash flow are analyzed taking into account the magnitude and the timing. IRR is that discount rate which gives a net present value