What landfill area will be required for solid waste disposal

Assignment Help Civil Engineering
Reference no: EM13299192

Assume solid waste is to be placed in the landfill 5 days per week. Solid waste will arrive at the landfill at a density of 120 kg/m3. Solid waste will be applied in 0.6 m "lifts" and will be compacted to a depth of 0.3 m. Daily cover soil will be applied to a depth of 0.15 m for the first four days of the operation in any week. At the end of the fifth day, a "weekly cover" layer of 0.30 m of soil will be applied. One week worth of deposits to the landfill (including solid waste and cover material) will be referred to as a cell. You may assume that recycling efforts in Tippecanoe County are such that only 50% of the solid waste that is generated in the County will require landfill disposal. Assume also that only solid waste generated in Tippecanoe County will be disposed of in the new landfill. Based on this information, what landfill area will be required for solid waste disposal in a 1-year period if the solid waste/soil is applied to a depth corresponding to 1 cell (as described above)? Express your answer in units of acres. For perspective, a football field (or a soccer field) has an area of roughly 1 acre.

Reference no: EM13299192

Questions Cloud

What will be the total amount of new loans in the economy : Ultimately what will be the total amount of new loans in the economy after Sammuels payment. Show your work.
What will be the new money supply in zamboa ultimately : Assuming no charge in E(the proportion of deposits that banks want to hold as excess reserves), and no charge in cash held by the public, what will be the new money supply in Zamboa ultimately be,following the central bank's action?
The case analysis on robin hood : The case analysis on Robin Hood
Whose advice should you follow : Assuming you have a choice between depreciation methods, whose advice should you follow? Why?
What landfill area will be required for solid waste disposal : Solid waste will be applied in 0.6 m "lifts" and will be compacted to a depth of 0.3 m. Daily cover soil will be applied to a depth of 0.15 m for the first four days of the operation in any week. At the end of the fifth day, a "weekly cover" layer..
Find the electric field amplitude at your ear : Consider a cell phone that emits electromagnetic radiation with a frequency of 1.0 GHz and with a power of 70 W. find the electric field amplitude at your ear as you use the phone
Is a high degree of market concentration a boon or threat : Is a high degree of market concentration a boon or threat to consumers? Explain. Use either the allocative efficiency or dynamic efficiency arguments.
Determine what is the rotational velocity at the instant : A fan blade, initially at rest, rotates with a constant rotational acceleration of 0.9rad/s^2. What is its rotational velocity at the instant it goes through an rotational displacement of 5 radians
Find the cutoff wavelength for copper : The work function for copper is 4.70 eV. Find the cutoff wavelength for copper

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd