What is the scale factor for the station in problem 20.14

Assignment Help Civil Engineering
Reference no: EM131143643

What is the scale factor for the station in Problem 20.14?

Problem 20.14:

Similar to Problem 20.13 except that the station's geodetic coordinates are 41°14'20.03582" N and 80°58'46.28764" W. Give coordinates in meters.

Problem 20.13:

What are the SPCS83 coordinates (in ft) and convergence angle for a station in the north zone of Pennsylvania with geodetic coordinates of 41°12'33.0745" N and 76°23'48.9765" W?

Reference no: EM131143643

Questions Cloud

Respond the given two discussions : Respond the given two discussions. - and add a citation/reference for each discussion. - DQ 1(CHI) - DQ 2 (Rhon)
Discuss the present budgeting system : Discuss the present budgeting system and its likely effect on divisional partner motivation. Explain two non-financial performance indicators (other than client satisfaction and service quality) that could be used by the firm
Identifying tasks or tactics for each aspect of marketing : Use the Product Lifecycle Worksheet (linked in the Resources under the Required Resources heading). Complete all of the sections of the worksheet, identifying tasks or tactics for each aspect of the marketing mix at each stage of the product lifec..
For each company calculate the asset turnover ratio : Based on your calculations in part (a), comment on the relative effectiveness of the two companies in using their assets to generate sales and produce net income.
What is the scale factor for the station in problem 20.14 : What are the SPCS83 coordinates (in ft) and convergence angle for a station in the north zone of Pennsylvania with geodetic coordinates of 41°12'33.0745" N and 76°23'48.9765" W?
What horizontal length would have to be observed to lay off : The given distances between points in this project area were computed from SPCS83 state plane coordinates. What horizontal length would have to be observed to lay off these lines on the ground? (Use 6,371,000 m for an average radius for the Earth...
Display information about users that are currently logged in : Change the permissions on this new file to add the execute bit for user, group, and owner. Display information about users that are currently logged in.
What functional strategies does an organization need : What functional strategies does an organization need - what might provide the basis upon which an organization decides on a competitive strategy?
Assume the books have not yet been closed for 2010 : Prepare all journal entries necessary to correct any errors made during 2010. Assume the books have not yet been closed for 2010.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the minimum value of the laser pulse energy per unit

(SBS is often excited by tightly focused laser beams rather than by collimated beams to prevent optical damage to the windows of the cell)

  Calculate maximum allowable shear force v max for the girder

is fabricated of two 300 mm X 25 mm flange plates and a 800 mm X 16 mm web plate. the plates are joined by four fillet welds that run continuously for the length of the girder. each weld has an allowable load in shear of 920 kN/m.

  A rectangular concrete channel is 3 m wide and 2 m high the

1.a rectangular concrete channel is 3 m wide and 2 m high. the water 20 deg celsius in the main channel is 1.5 m deep

  Determine the friction drag on one side of the plate

Water flows past a triangular flat plate oriented parallel to the free stream as shown. Integrate the wall shear stress over the plate to determine the friction drag on one side of the plate. Assume laminar boundary layer flow.

  Determine which material has a better toughness and why

Two materials A and B are tested and a stress-strain curve is plotted. Material B has a yield stress of 200 MPa and Material A has a Yield stress of 120 MPa. These materials have plastic Deformation occur at the same Yield strain %.

  Determine space mean speed

Data obtained from aerial photography showed six vehicles on a 600 ft long section of road. Traffic data collected at the same time indicated an average time headway of 4 sec. Determine the (a) density on the highway (b) flow on the road (c) space me..

  Determine the discharge through the pipeline

a 2000 m long commercial steel pipe of 200 m diameter converys water at 20 C between two reserviors. the difference in water level between the reserviors is maintained at 50 m.

  What is the steady state co concentration

What is the steady state CO concentration? c. Given the steady state CO mixing ratio in part above (assume 1 atmosphere pressure and 288 K) what is the resulting %COHb and what is the health impact if exposed to this concentration overnight while you..

  Design the traffic pole against torsion knowing that angle

The maximum wind pressure on the traffic sign is 200 kg/m2. The maximum allowable shear stress is 350 kg/cm2. Design the traffic pole (only vertical element) against torsion knowing that angle of twist at the base should not exceed 6°.

  Sketch the cycle on p-v coordinates

A quality of water within a piston-cylinder assembly executes a Carnot power cycle. During isothermal expansion, the water is heated from saturated liquid at 50 bar until it is a saturated vapor. The vapor then expands adiabatically to a pressure ..

  Use matlab to determine how many days the price of stock a

Use MATLAB to determine how many days the price of stock A was above both the price of stock B and the price of stock C.

  Determine what percent of particle are retained in clarifier

if the settling velocity of a particle is 2.8 mm/s and the overflow rate of an upflow clarifier is .56 cm/s what percent of the particles are retained in the clarifier

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd