What is incremental contribution associated with adding

Assignment Help Operation Management
Reference no: EM131152681

Western Chassis produces high-quality polished steel and aluminum sheeting and two lines of industrial chassis for the rack mounting of Internet routers, modems, and other telecommunications equipment. The contribution margin (contribution toward profit) for steel sheeting is $0.40 per pound and for aluminum sheeting is $0.60 per pound. Western earns $12 contribution on the sale of a Standard chassis rack and $15 contribution on a Deluxe chassis rack. During the next production cycle, Western can buy and use up to 25,800 pounds of raw unfinished steel either in sheeting or in chassis. Similarly, 20,400 pounds of aluminum are available. One standard chassis rack requires 16 pounds of steel and 8 pounds of aluminum. A Deluxe chassis rack requires 12 pounds of each metal. The output of metal sheeting is restricted only by the capacity of the polisher. For the next production cycle, the polisher can handle any mix of the two metals up to 4,000 pounds of metal sheeting. Chassis manufacture can be restricted by either metal stamping or assembly operations; no polishing is required. During the cycle no more than 2,500 total chassis can be stamped, and there will be 920 hours of assembly time available. The assembly time required is 24 minutes for the Standard chassis rack and 36 minutes for the Deluxe chassis rack. Finally, market conditions limit the number of Standard chassis racks sold to no more than 1,200 Standard and no more than 1,000 Deluxe. Any quantities of metal sheeting can be sold.

A) Find an optimal solution to Western's problem. What is the production plan, and what is the total revenue?

B) Obtain a sensitivity report for the solution reported in Part 1. Which constraints are binding?

C) What is the incremental contribution associated with adding an hour of assembly time? Over what range of increase is the marginal value valid?

D) What is the value of additional capacity on the polisher? How much increase and decrease in this capacity is possible before a change occurs in the optimal production schedule? E) An advertising agency has devised a marketing plan for the Western Chassis Company that will increase the market for Deluxe chassis. The plan will increase demand by 75 Deluxe chassis per month at a cost of $100 per month. Should Western adopt the plan? Briefly explain why.

Reference no: EM131152681

Timing is always a challenge in managing projects

Timing is always a challenge in managing projects. Construct a network diagram for the spa selection process. How soon can the Phoenician management make a decision on the spa

How could the firm mitigate these risks

Imagine that one firm that buys another firm. What issues might arise as they attempt to merge their respective performance management systems? What might be the risks for the

What the author means by the statement

Explain what the author means by the statement that "Every manager is an HR manager". Do you agree? Give examples to support your point of view. Respond to at least two of y

What are the two principle activities in strategic planning

What are the two principle activities in strategic planning. Why is it important to correctly identify and address these two activities to ensure success in the quality init

Business environment-single definition of quality

In today’s business environment, there is no single definition of quality. Discuss the Takata’s airbags currently under recall using one (1) of the definitions of quality. Tak

Understand the financial side of the healthcare organization

Why does an operations manager need to understand the financial side of the healthcare organization? How are the three financial statements related and what does the informati

A firm uses a serial assembly system

A desired output of 900 units per shift (7.5 hours) is desired for a new processing system. The system requires product to pass through four stations where the work content at

Authority based knowledge is the systematic pursuit

Authority based knowledge is the systematic pursuit of knowledge involving the recognition and formulation of a problem to be solved, the collection of data through observatio

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd