What are the cost and schedule variances for the project

Assignment Help Business Management
Reference no: EM131302854

Problem 1. A project in its 26th week has an actual cost of $270,000. It was scheduled to have spent $261,000. For the work performed to date, the budgeted value is $272,000. What are the cost and schedule variances for the project? What are the SPI and CPI?

Problem 2. A project has just completed its 87th item in the project plan. It was scheduled to have spent $168,000 at this point in the plan, but has actually spent only $156,000. The project manager estimates that the value of the work actually finished is nearly $162,000. What are the spending and schedule variances for the project? What are the SPI and CPI?

Problem 3. The following project is at the end of its 6th week. Find the cost and schedule variances. Also find the CPI and SPI. Then find the critical ratio of the project using earned value calculations. Finally, calculate the ETC and EAC for the project.

Activity

Predecessor

Duration (wks)

Budget ($)

Actual Cost ($)

%Complete

a

-

2

300

400

100

b

-

3

200

180

100

c

A

2

250

300

100

d

A

5

600

400

20

e

b,c

4

400

200

20

Problem 4.  

Using the concepts from Session 11 reading (textbook and reserved readings), respond to following with a thorough explanation. Include any citations for references used to support your answer.

1. What are some reasons that a failing project still might not be terminated?

2. Who would make the best auditors: outside unbiased auditors or inside auditors who are more familiar with the organization, its procedures, and the project?  Why?

3. Under what circumstances would you change your answer to the previous question?

4. Should the results of an evaluation or audit be shared with the project team?

5. What are the major purposes served by an after-the-fact project evaluation?

Problem 5. Solve the following Case:

Stoneworth Paving Company specializes in highway paving jobs for state of Virginia. When the State first awarded Stoneworth the contract, they stipulated a 1% penalty for each week Stoneworth was late on a completion date. Preston Flintrock, the project coordinator for Stoneworth, began to notice that the last two jobs were three weeks late, and the paving job that was due to be completed in the next two weeks was behind schedule. When Preston went in the field to investigate, he found the job to be understaffed, supplier delays, and a high work rejection/repaving needed. As a result, Preston decided to establish a better system of project control and present it to the boss.

Question 1: If you were Preston, what characteristics would you be looking for in a new control system? Explain

Question 2: Will a new control system be adequate for the problem? Explain

Reference no: EM131302854

Questions Cloud

What is the cross-rate of swiss francs to euros : Suppose the exchange rate between U.S. dollars and Swiss francs is SF 1.143 = $1.00, and the exchange rate between the U.S. dollar and the euro is $1.00 = 1.1033 euros. What is the cross-rate of Swiss francs to euros (SF/Euro)? Enter your answer roun..
What are the total shortage costs : ABC Company sells 2,995 chairs a year at an average price per chair of $198. The carrying cost per unit is $27.77. The company orders 330 chairs at a time and has a fixed order cost of $31 per order. The chairs are sold out before they are restocked...
What are organizational controls : What is organizational structure and what are organizational controls? What are the differences between strategic controls and financial controls? What is the importance of these differences?
Do businesses have social responsibilities : Do businesses have social responsibilities? Why or why not? What can be some social aspects of businesses?
What are the cost and schedule variances for the project : Problem 1. A project in its 26th week has an actual cost of $270,000. It was scheduled to have spent $261,000. For the work performed to date, the budgeted value is $272,000. What are the cost and schedule variances for the project? What are the S..
What type of adjustments must advertising agencies make : What type of adjustments must advertising agencies make as more companies want "one sight, one sound, one sell" campaigns? Use examples if possible.
Lowers expected rate of return on foreign currency deposits : Briefly explain your answer. No credit without explanation. Support your answer with a graph if needed. Depreciation of the domestic currency today (i.e. EH/F in class) lowers the expected rate of return on foreign currency deposits.
Propose a type of message appeal to be used in advertising : Propose a type of message appeal to be used in the advertising, making sure to explain rationale behind appeal. Analyze different cultures product will appeal to and make recommendations on which three would be best choice.
How can you assess and address risk factors : Can risk be eliminated if the project is well and carefully planned? How do you calculate acceptable risks? How can you assess and address risk factors? Please explain. Use a specific example to support your answer.200 words

Reviews

Write a Review

Business Management Questions & Answers

  The interest can be reinvested at 5% before tax

The interest can be reinvested at 5% before tax

  Empowerment in bureaucratic structure

Will an introduction or addition of empowerment into a formerly bureaucratic organization actually result in a more bureaucratic structure than before?

  Determining the cross-subsidization

Imagine the bank makes the same five loans as in part a., but must charge all borrowers the same interest rate. What interest rate will it charge to break even overall? Which borrowers pay less, which pay more in this case than in part a.? This pr..

  Company presence in domestic and international markets

Please elaborate and submit one resource. These questions are pertaining to AUDI (the car company) The company's presence in domestic and international markets. The company's vision and execution of strategy that set its direction.

  Anticipating change gebased on information obtained at ges

anticipating change gebased on information obtained at ges web site anecdotal information and personal experience you

  Mcq on principle of management

Within an organization, the control process normally progresses through four steps. Discuss these steps as they would apply to an important management situation of your choosing.   Step 1. Establish the standards of performance, goals, or targets ..

  Calculate the npv for each alternative

Calculate the expected NPV for each alternative. Explain the decision rules for making a selection between the two alternatives on the basis of the expected NPV.

  Global perspectives for international business

The political, economic, and legal infrastructure of a nation has a major influence on the way managers make decisions.  Political systems have two dimensions: the degree of collectivism versus individualism, and the degree of democracy versus tot..

  Techno corporation is currently manufacturing an item

Techno Corporation is currently manufacturing an item at variable costs of $ 5 per unit. Annual fixed costs of manufacturing this item are $ 140,000. The current selling price of the item is $ 10 per unit, and the annual sales volume is 30,000 uni..

  Incorporated into us trade legislation

To what extent have the traditional arguments that justify protectionist barriers actually been incorporated into US trade legislation? At what stage in US trade history did protectionism reach its high point?

  Explanation of the principle components

Explanation of the principle components of your revised compensation and benefit system for a large-scale organization as well as a recommendation for each component

  Valuate the role that internal controls played

What are the legal liabilities of board members and members of the audit committee? Analyze the facts of the case and comment whether they violated their legal ethical obligations Are there any parallels in the case with the Tyco case discussed in Ch..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd