The current production systems and processes

Assignment Help Operation Management
Reference no: EM131165268 , Length: word count:1200

Purpose

The primary purpose of this assessment task is to help students develop skills in the use of Operations Management principles, theories and models in the analysis of the current operations of a manufacturing enterprise. The assignment requires you to analyse the current situation. The objective is to identify and specify the problems that exist - DO NOT TRY TO ‘SOLVE' THE CASE.

The secondary purpose of this assignment is to give students the opportunity further develop analysis and problem identification skills, as well as generic academic research and writing skills within the framework of a formal essay.

Description

Assessment task 2 requires the writing of an academic essay. This essay should be an ‘argumentative essay', and must therefore contain an argument that is used as the structuring element of the paper. The assignment is based on a short case study that describes a manufacturing organisation that is going through a process of growth and change. The purpose of the essay is to identify the operational issues within the case, and to identify root causes of the problems that are evident. Students are expected to engage in extensive research within the academic literature relating to operations management. Some research into the industry of interest would also be beneficial.

Case Study: Hawkesbury Cabinets Pty Ltd

Hawkesbury Cabinets Pty Ltd designs and manufactures custom-built kitchen cabinetry. The company was founded in Mulgrave, Sydney in 2008 by siblings Fung and Mei Chen. Fung is a master cabinetmaker and Mei is a qualified interior designer. The company had originally set out to service the needs of the growing Chinese community in the Hawkesbury. As the reputation of the company grew however, Fung and Mei found that their client base became more and more diverse. Fung's duties had evolved over time, and he now fulfilled the role of production and operations manager. Mei, on the other hand, had found an interest in the financial and overall management of the enterprise and so she had effectively taken on the role of general manager. So while there was no formal identification of roles for the two owners, there was a fairly comfortable distribution of managerial responsibilities.

Traditionally, Hawkesbury Cabinets had focused entirely on custom-made kitchens, with the customer consulting with Mei to develop a unique kitchen designed specifically for the client's needs. As the company's reputation grew and sales increased however, several low volume contracts had been signed to supply small ‘spec' builders1 with a range of high quality, but standardised kitchen cabinetry. These contracts required Hawkesbury Cabinets to manufacture a limited range of kitchen cabinets in small batches. Batch sizes ranged from a single kitchen up to five kitchens of similar specifications. The client builders imposed more stringent delivery requirements and were far more price sensitive than custom-made kitchen buyers. Whilst the custom-designed cabinetry continued to account for the majority of the company's sales, the builders' kitchens were becoming increasingly important. Currently, the standardised kitchens accounted for 40 percent of factory volume and 25 percent of revenue.

Hawkesbury Cabinets operates a single manufacturing facility in Mulgrave, where both custom and standard kitchen cabinets are manufactured. The cabinet-making equipment consists mainly of high quality general purpose machines in order to provide the flexibility needed for producing a wide variety of custom designed cabinets. The factory layout has various types of equipment grouped together. Saws and cutting tables are in one section, routers and shapers in another, whilst lathes and other less frequently used machines are kept away from the work area in their own section. There are also several assembly areas located strategically throughout the factory. Painting and finishing is done in an environmentally controlled section towards the rear of the facility. The quality of Hawkesbury Cabinets' finished products is held in high esteem, and reflects the quality of the materials chosen and the craftsmanship of the individual cabinetmakers. Both the custom and the standard cabinets had to compete for processing time on the same equipment by the same craftspeople.

During the past few months, sales of the builders' line of kitchens had steadily increased, leading to more regular scheduling of this work. However, when scheduling trade-offs had to be made, the custom kitchens were always given priority because of the higher sales and profit margins.
Thus scheduled lots of standard cabinet components were left sitting around the plant in various stages of completion. This increase in the volume of work in process had changed the previously spacious manufacturing area into a factory clogged up with partially completed work.

As she reviewed the progress of Hawkesbury Cabinets, Mei Chen was pleased to note that the company has grown. Sales of custom kitchens remained strong, and sales of the builders' line were steadily increasing. However, the company accountant argued that profit margins were not

what they should be. Costs associated with the standard builders' line were rising. An increasing amount of capital was being tied up in raw materials inventory, work in process and finished product. To accommodate the increased volume of inventory, nearby warehouse space was now being rented. Mei Chen was also concerned with increasing lead times for both custom and standard orders. This was resulting in longer promised delivery times. The current operations systems were pushing manufacturing capacity to the limit, and with the current layout, no space was left in the plant for expansion. Mei Chen decided that the time has come for her and her brother to take a careful look at the overall impact that the new line of standard builders' kitchens was having on their operations.

Assessment Task

After you have carefully read and analysed the case study, write an essay discussing the operational issues facing Hawkesbury Cabinets. The essay should identify and discuss the operational aspects that are affecting the organisation, paying attention to both medium-term and day-to-day implications. Your argument should address the following three issues with responses integrated within the essay.

1. The current production systems and processes used by Hawkesbury Cabinets (a technical analysis).

2. The effect of the new builders' kitchen line on Hawkesbury Cabinets' operations (problem definition).

3. The effect the move to producing builders' kitchens might have on the company's financial structure2. (broader organisational issues caused by operational problems).

Your essay should be a properly constructed academic essay. It should contain an effective introduction, body and conclusion. The introduction should introduce the essay and include your argument. The body should present the evidence you have collected to support your argument, and the conclusion should restate your argument, summarise the evidence and make a conclusion regarding your argument.

The essay should contain a coherent, but necessarily restricted review of the academic literature on the Production and Operations Management topics in question. The literature review should be integrated into the essay, not a separate section. Do not use headings or include an abstract.

A reference list is compulsory. Do not include a bibliography. Further information regarding formatting of assignments is available on the course website.

Reference no: EM131165268

Questions Cloud

What stage is the most important in crime analysis process : Identify and discuss what stage is the most important in the crime analysis process. Be sure to provide specific examples
Find energy stored in the capacitor at t=0s : Switch is closed at t=0 s. Since the circuit has no resistance, capacitor charges instantly, find energy stored in the capacitor at t=0s.
What is purpose of national committee for quality assurance : Which one of the following statements is true according to the "gatekeeper" concept? What is the purpose of the National Committee for Quality Assurance (NCQA)?
How often do you feel a security plan should be evaluated : How often do you feel a security plan should be evaluated? Would a review of the plan also include a test of its contents in a table top exercise? Why or why not
The current production systems and processes : The current production systems and processes used by Hawkesbury Cabinets (a technical analysis) - The effect of the new builders' kitchen line on Hawkesbury Cabinets' operations (problem definition).
Justify components of material list and resource requirement : I need to justify the components listed in the attached document names Materials List and Resource Requirements.
What can be done to defend against attack explain : What are your thoughts on the use of suicide bombing as a terrorist tactic? Explain. Is this an effective tactic for spreading terror? Why or why not? What can be done to defend against this type of attack? Explain
Energy is conserved for the entire system : Even though energy is conserved for the system, why is it a good idea to make the components of the drive mechanism as light as possible (with the exception of the flywheel)?
Monopolistic competition works : Take a position on whether or not monopolistic competition works within a healthcare setting. Support for your position should include a discussion of the monopoly model being used to predict the allocation of resources in healthcare markets withi..

Reviews

Write a Review

Operation Management Questions & Answers

  Illustrate what would happen to during put of the line

Illustrate what would happen to during put of the line if we replaced the large single-machine at the bottleneck station with four smaller machines and held WIP at its current level.

  Illustrate what is the earliest finish time for activity

Illustrate what is the earliest finish time for activity 10-11 (far right hand side), if the earliest start time of 8-10 (upper left hand side) is 12 also the earliest start time of 9-10 (lower left hand side) is 13.

  Determine whether ability or motivation is more important

Determine whether ability or motivation is more important in selecting the right person for the right job. Explain your rationale compare and contrast what motivates Millennials from Baby Boomers and Generation X. Assess whether motivating these grou..

  Ethics of high corporate CEO pay during an economic downturn

Executive compensation is typically set by a free market; that is, corporate boards may offer whatever compensation they choose to get the individual they want. Most corporate executives are working their hardest during times when companies are strug..

  The forecast is 80 units for each of the first two periods

The forecast is 80 units for each of the first two periods and 60 units for each of the next three periods. The starting inventory is 20 units.

  Explain the similarities and differences of medicare

Explain the similarities and differences of Medicare and Medicaid managed care plans by comparing and contrasting the following three issues

  The decision to close a project before actual completion

the decision to close a project before actual completion can happen for many different reasons. describe a project you

  Course of action afc should follow in launching new product

AFC is about to launch its new Wings N Things fast food nationally. The research department is convinced that Wings N Things will be a great success and wants to introduce it immediately in all AFC outlets without advertising. Draw the associated dec..

  Product flown in immediately because

Philip Newman runs a seafood restaurant in Toronto. Nowadays, it is possible for him to buy fresh grouper in Indonesia and have the product flown in immediately because _________________.

  Describe the four major issues surrounding the management

describe the four major issues surrounding the management of international projects.

  Daily production of conwip line is normally distributed

Daily production of a CONWIP line is normally distributed with a mean of 300 pieces and a standard deviation of 60 pieces. The WIP level of the CONWIP line is 1,500 pieces. Currently there is a release list of 1,680 pieces with an “emergency position..

  Elucidate how would you respond

She tells you she believes which air quality in building is bad also would like something to be done. Elucidate how would you respond.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd