Study on managing software project resources

Assignment Help Project Management
Reference no: EM13317232

Managing Software Project Resources

1) If a person has been certified by a Project Management certification body such as PMI, IPMA, AIPM, APM but has never been on an IT project team, would you even consider hiring that person to manage an IT project? Justify your answer.

2) Selectan IT project that you are familiar with an dcomment on whether there was a formal project sponsor and champion, which business managers played these roles, and whether or not you think their roles positively affected the project out comes.

This section contains the following elements:

• References with Harvard style and the number of references not less than three Academic Articles or books.
• The answer of each question should have about 500 words.
• Please, make sure that there is no Plagiarism

Reference no: EM13317232

Questions Cloud

Sexual harassment-human resource : You are the Human Resource Director for a company that includes a large clerical staff supervised by a female manager. The staff consists of 22 females and one male. The male clerical worker has come to you accusing the manager of sexual harassment.
Determine the drift speed of the electrons in the wire : Gold has one conduction electron per atom. Its density is 19.3gr/cm3,molar mass is 197 gr/mole, determine The drift speed vd of the electrons in the wire
Find entropy changes of refrigerant and thermal reservoir : A thermal reservoir (T=308K) is brought in contact with the tank, transferring enough heat to the tank to raise the pressure inside to 4 bar. Calculate the entropy changes of the refrigerant and the thermal reservoir
What is the total amount of charge on nonconducting shell : A particle with a charge of -60.0 nC is placed at the center of a nonconducting spherical shell of inner radius 19 cm and outer radius 31.0 cm. What is the total amount of charge on the nonconducting shell
Study on managing software project resources : If a person has been certified by a Project Management certification body such as PMI, IPMA, AIPM, APM but has never been on an IT project team, would you even consider hiring that person to manage an IT project? Justify your answer.
Calculate the amount of heat added to the water : An electric resistance heater now heats the water. Calculate the amount of heat added to the water and the associated change in entropy when the volume of the water is 50 times its initial value.
Determine the voltage drop across each resistor : Three resistors of 40 ohms, 60 ohms and 100 ohms connected on a close circuit with 200 Volt source (assume ideal circuit). With Resistors connected in Parallel:  determine the voltage drop across each resistor
Silver fiddle construction case-potential risks associated : Silver Fiddle Construction Case You are the president of Silver Fiddle Construction (SFC), which specializes in building high?quality, customized homes in the Grand Junction, Colorado, area. You have just been hired by the Czopeks to build their drea..
Determine the axial stress in the tank wall : A steel scuba tank is 24 in. long and has an external diameter of 7.25 in. and an internal diameter of 6.7 5in. Say the tank is to carry a pressure of 3000psi . Determine the hoop stress in the tank wall. Determine the axial stress in the tank wal..

Reviews

Write a Review

Project Management Questions & Answers

  Project manager interface between business and technology

Explain the role of a project manager as an interface between business and technology professionals in an organization.

  How and why you would use a wbs in a project

Work breakdown structure of a project - How and why you would use a WBS in a project

  Possible steps included in project closure

What are possible steps included in project closure?

  Explanation of performance improvement project

Show a performance improvement project you have been involved in or had knowledge of. What process was used to identify the need for an improvement and what steps were taken to work through the process to achieve the improvement?

  Determine the critical path and project duration in days

Determine the critical path and project duration in days and given that each resource is assigned 100% to each task, identify the resource constraints.

  Cost in project management

Cost in Project Management - Why is it important for management to understand the forecasted cost at completion (FCAC)?

  Discounted profitability index of the project

Using Excel or pencil and paper, what is the discounted profitability index of the project?

  Operating cash flow for project -straight-line depreciation

The company uses straight-line depreciation to a zero book value over the life of the project. The tax rate is 35%.

  Project management task - trade show plan

Find and achieve basic competency in technical areas of project management including PERT, CPM, Gantt, Work Breakdown Structures, and other forms of project planning and control. Prepare a project plan from given elements of a project scenario.

  Enhancing steps associated with reengineering

Select the PERT technique you consider LEAST valuable when altering or enhancing steps associated with reengineering. Explain your choice. Describe and analyze how the two techniques you chose influence the Critical Path Method.

  Calculating the probability of project completion

Calculate the probability that the project will be completed in 38 weeks.

  Show the aspects of project management

Aspects of project management and the most time consuming - In your organization, what aspects of the change management process are the most time-consuming?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd