Learn how all the numbers fit together

Assignment Help Cost Accounting
Reference no: EM13828237

Objectives:

1.         Apply accounting manufacturing concepts to an actual product to solidify the learning process.

2.         Learn how all the numbers fit together.

3.         Develop decision making analysis techniques.

Manufacturing Questions Instructions:

  1. This project should stand by itself.  Include the questions with your submission--not just the answers.  Identify all numbers.  Points will be deducted if I can't understand what you are answering.
  2. You may use Excel to complete tables and/or answer questions.  Just make sure you label your work and turn the Excel file in.
  3. You may discuss this project with classmates.  A discussion board will be set up for this project.  Try to get help from classmates first.  Your professor will only provide limited individual help. 

Your information:

  1. Your company produces a basic potato chip. There are three main processes used in the chips.  The first process washes and peels the potatoes.  The second process slices and fries the potatoes.  The third process seasons and packages the chips.  The potato chips are sold in 12 oz bags (1 bag is a unit)
  1. Information on the direct materials is listed in table 1. Consider this information the standard.  
  1.  Direct labor information given in Table 2.  Consider this information the standard. 
  1. Annual overhead information is given in Table 3. Overhead is allocated based direct labor hours.  Estimated annual direct labor hours are 12,500.  Calculate a predetermined OH rate (round to two decimal places if needed).  Use this rate when you need to apply OH.
  1. Table 4 gives you the information for the last two months on the overhead cost.  Use this information to determine the fixed and variable portions of the cost.  (You will need this information to complete Table 5). Machine hours have been determined as the best cost driver for separating mixed cost into their fixed and variable portions. It takes approximately 12 minutes of total machine time for each bag of chips (or 1/5 a machine hour per bag of chips).
  1. Table 5 is where you will list all your production cost, separated into their fixed and variable components.
  1. Cost-Volume-Profit (CVP) Relationships

a.    Selling Price:  You sell a bag of chips for $4.00

b.   Breakeven point: Calculate the breakeven point.   Be sure to include the fixed component of mixed cost in your fixed costs and the variable component in the         variable cost.  Show your breakeven in Sales units and in Sales Dollars

c.    Profit Planning:  Determine the number of units you must sell to make an annual pre-tax profit using 3 assumptions concerning your net income (profit), both in sales units and sales dollars.

                                                              i.      Aggressive Profit ($100,000)

 

                                                            ii.      Conservative Profit ($25,000)

 

                                                          iii.      Average Profit ($60,430)

  1. Budgeting: 

a.                   Create a sales budget using the information for earning an average profit for the year.  You will break the budget down into the four quarters for the year. (Sales tend to be consistent each quarter, you can only sale a whole unit so round-up if necessary) Use table 6 to complete the sales budget.

b.                  Create a production budget for each quarter of the year (keep it in quarters; you do not need to break it down by month).  You desire to keep 10% of next quarter's sales in ending inventory.  Sales for Qtr 1 the following year are expected to be 30,000 bags of chips. There is not any beginning finished goods inventory for quarter one. Use table 7 to complete the production budget.

  1. Running quarter one -- Weighted-average process costing.  Table 8 presents the information for the packaging department.  Complete the questions under table 8.
  1. Actuals are in for quarter one.  You sold 25% more units than you budgeted for, but price per unit was only $3.80.

a.                   Calculate revenue

b.                  Compute the cost of goods sold (total and per unit) before adjusting for actual OH cost

  1. Actual potato usage for quarter one was 68,000 pounds at a price of $0.45 per pound. Actual equivalent units of production (bags of chips) completed through the fist process (where the potatoes are added) was 29,520.  Calculate the direct materials variances for the potatoes (price, usage, and total) and indicate if these variances are favorable or unfavorable.
  1. Actual direct labor hours for the quarter were 4,830 at an average rate of $8.10 per hour.  For actual production you expected to use 4,200 direct labor hours.  Calculate the direct labor variances (rate, efficiency and total) and indicate if these variances are favorable or unfavorable. 
  1. For next quarter you have been asked to supply a special order of you potato chips.  The non-profit organization requesting this order would like a special bag that will cost $0.20 instead of the normal $0.10 per bag.  The request is for 10,000 bags of chips.  Based on your projections you have the capacity for this order.  What is the minimum price per unit and total price you would be willing to accept on this order?  (You cannot afford to take this offer at a loss, but you are fine with accepting it at cost).
  1. Determine over- or under-applied overhead and close to cost of goods sold.  Actual OH cost are given in table 14 (look at #12 for actual DL hours used to apply OH).  Determine the new cost of goods sold amount. 

Table 1: Direct Materials

Material                Quantity            Cost           Total                                                                      per unit                                   per unit                                  

Potatoes

1.5 lbs

$0.50

$0.75

Seasoning

0.1 ounces

$0.50

$0.05

Packaging

1 bag

$0.10

$0.10

 

1/12 box

$0.48

$0.04

 

 

 

 

TOTAL

 

 

$0.94

Table 2:   Direct Labor

 

                                                    Hours                        

                                                   Per Bag

Job Description                         of chips             Rate           Total Cost

Potato Washer  & Peeler

.1

$8.00

$0.80

Slicer & Fryer

.04

$8.00

$0.32

Packager

.05

$8.00

$0.40

 

 

 

 

Total

0.14

 

$1.52

 

Table 3:  YEARLY OVERHEAD  COSTS

          Cost  Description                                      Total Cost                             

Indirect Materials

$6,000

Indirect Labor

60,010

Machine Maintenance

4,040

Electricity

3,440

Depreciation

4,680

Quality Testing    

10,160

TOTAL

$88,330

 

Predetermined OH rate:

Table 4 - Actual Overhead cost for the last two months

 

 

Month 1

Month 2

Indirect Material

$500

$500

Indirect Labor

$5000.83

$5000.83

Machine Maintenance

$250

$290

Electricity

$200

$240

Depreciation

$390

$390

Quality Testing

$630

$730

 

 

 

Machine Hours*

1000

1200

 

 

 

*12 minutes of machine time per bag of chips (1/5 hour = 1 unit)

 

 Complete any calculations here:

 

 

 Table 5:  Variable and Fixed Costs

 

COSTS Description                  VARIABLE Cost per unit                    FIXED Cost per Year           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

             TOTAL

 

 

If a cost is mixed, put the fixed amount in the fixed column and the variable amount in the variable column.

 

CVP Calculations:

 

 

Table 6 - Sales Budget

 

Qtr 1

Qtr 2

Qtr 3

Qtr 4

Total

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Table 7 - Production Budget

 

Qtr 1

Qtr 2

Qtr 3

Qtr 4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Process Costing - Packaging Department

 

Direct materials are added 70% at the beginning of the process and the remaining 30% are added when the chips are 50% complete with the packaging process.  Direct labor and overhead are added evenly throughout the process.

 

Table 8 - Unit and cost information

 

 

Cost

 

Physical Units

Transferred-in

Direct Materials

Direct Labor

Overhead

Beg WIP

1,000 (40% complete)

$5,550

$110.40

$165

$141.44

Transferred In

30,000

$73,500

 

 

 

End WIP

2,200 (30% complete)

 

 

 

 

 

Added during Qtr 1:

Direct Materials -- $4,835.02

Direct Labor - 1,580 hrs @ $8.10 per hour

Overhead - OH is applied based on predetermined OH rate and actual DL hours

1. Determine the number of units completed during quarter 1.

2. Compute the equivalent units using the weighted average method

3. Compute the cost per equivalent unit using the weighted average method

4. Compute the cost of goods transferred to finished goods inventory

5. Compute the ending balance in WIP, Packaging

Table 10 - Actual Results (calculate revenue and COGS)

Units sold

Sales Price

Revenue

 

 

 

 

 

 

Units sold

Cost per unit

COGS

 

 

 

 

 

 

 

Table 11 - DM Variances (potatoes only)

Price Variance

 

Usage Variance

 

Total Variance

 

 

Calculations:

Table 12 - Direct Labor Variances

Rate Variance

 

Efficiency Variance

 

Total Variance

 

Calculations:

#13 Calculations (Minimum price on special order)

Table 14 - Actual OH cost for Quarter 1

Description

Cost

Indirect Materials

$1,750

Indirect Labor

$15,000

Machine Maintenance

$1,416.20

Electricity

$1,235.75

Depreciation

$1,050

Quality Testing

$4,615

 

Amount of applied OH:Amount of actual OH:

Under or Over- Applied Amount:

New COGS amount:

Reference no: EM13828237

Questions Cloud

Calculation of interest rate swap in return for libor : Under the terms of an interest rate swap, a financial institution has agreed to pay 10% per annum and to receive the 3-monthLIBOR in return on a notional principal of $50 million with payments exchanged every 3 months.
Report on swot analysis of apple inc : Report on SWOT Analysis of Apple Inc.
Developing a preliminary business plan : Developing a Preliminary Business Plan
Report on swot and stratefic analysis of apple : Report on SWOT and Stratefic Analysis of Apple for the near future
Learn how all the numbers fit together : Objectives: 1.         Apply accounting manufacturing concepts to an actual product to solidify the learning process. 2.         Learn how all the numbers fit together. 3.         Develop decision making analysis techniques.
Determining futures prices with bonds maturing : The futures price for the June 17, 2009 CBOT bond futures contract is 118-23.
Definition of cultural competency : In paragraph eight, the author mentions the term "cultural competency". Provide a definition of "cultural competency" and list your source (s)
Hedging a bond portfolio with t-bond futures : A portfolio manager uses a T-bond futures contract to hedge a bond portfolio over the next 4 months. The portfolio is worth $75 million and will have duration of 5 years in four months. The futures price is 118 and each contract is for $200,000. T..
Representing profit-breakeven and expected profit : A speculator is considering the purchase of five three-month Japanese yen call options with a striking price of 96 cents per 100 yen. The premium is 1.35 cents per 100 yen.

Reviews

Write a Review

Cost Accounting Questions & Answers

  What is annual depreciation based on straight-line method

Hacol Company acquired an asset on January 1, 2003, at a cost of $38,000, with an estimated useful life of 8 years and a salvage value of $2,000. What is the annual depreciation based on the straight-line depreciation method?

  What is charless basis in his stock and debt

What is Charless basis in his stock and debt at the end of the year and what is Charles's basis in his stock and debt at the end of the year if the corporation reports losses of $90,000?

  Prepare a salary budget for the fiscal year

Prepare a salary budget for the fiscal year 7/1/X1 to 6/30/X2. Staffing levels are based on the need for six hours of hands-on work per patient day.

  Prepare adjusting entries - vandiver company

Prepare journal entries to record the transactions. Vandiver prepares adjusting entries once a year on December 31.

  Practice in reading code and regulations

Purpose of assignment is practice in reading the Code and the regulations - How much gross income must Sue identify for 2012 with respect to the discount plan?

  What is the project net present value

East Coast Television is considering a project with an initial outlay of $X (you will have to determine this amount). It is expected that the project will produce a positive cash flow of $59,000 a year at the end of each year for the next 16 years..

  Compute warrens actual return on plan assets

For Warren Corporation, year-end plan assets were $2,144,800. At the beginning of the year, plan assets were $1,755,200. During the year, contributions to the pension fund were $120,000, and benefits paid were $200,000.

  Evaluate what is the npv for each project

Find what is the IRR for each project and evaluate what is the NPV for each project?

  Determine the cost recovery deduction for 2013

On June 1, 2012, Josh purchased a used automobile that cost $24,000. The car is used 60% for business and 40% for personal use. (Assume this percentage is maintained for the life of the car.) Determine the cost recovery deduction for 2013.

  Compute the cost of solvent transferred

The production supervisor estimates that the ending work in process is 60 percent complete. Compute the cost of solvent transferred to finished goods and the amount in work-in-process ending inventory as of November 30.

  Change in cost absorption difference

Required to work out the reason for the change, and the movement analysis of Sales and Cost have been performed -  Change in Cost Absorption difference

  Prepare a budgeted income statement for 2013

Prepare a budgeted income statement for 2013 and a budgeted balance sheet at December 31, 2013. In preparing the income statement, you will need to compute cost of goods manufactured

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd