Find the hypotenuse of a right triangle

Assignment Help Other Subject
Reference no: EM13679274

Question 1 

Angles are measured in units of:

A. degrees, minutes, and seconds.

B. hours, minutes, and seconds.

C. feet and inches.

D. decimals.

Question 2 

For a seven-sided polygon, what is the sum of the interior angles?

A. 90 degrees

B. 180 degrees

C. 1260 degrees

D. 900 degrees

Question 3 

Right triangles have one of three internal angles that must equal to:

A. 180 degrees.

B. 45 degrees.

C. 60 degrees.

D. 90 degrees.

Question 4 

What is the decimal equivalent of 220 degrees, 45 minutes, and 39 seconds?

A. 220.84

B. 220.46

C. 221.00

D. 220.76

Question 5

Maximum number of characters (including HTML tags added by text editor): 60,000

Show/Hide Rich-Text Editor

Question 6 

64 degrees is equal to how many degrees, minutes, and seconds?

A. 124 degrees, 6 minutes, and 4 seconds

B. 124 degrees, 38 minutes, and 4 seconds

C. 124 degrees, 38 minutes, and 24 seconds

D. 124 degrees, 1 minute, and 7 seconds

Question 7 

What is the side opposite a 35 degree angle of a right triangle with a hypotenuse equal to 44.76 feet?

A. 25.67 feet

B. 36.66 feet

C. 31.34 feet

D. 63.30 feet

Question 8 

What is the angle adjacent to a side equal to 23 feet, and opposite a side equal to 14 feet of a right triangle?

A. 58.67 degrees

B. 31.33 degrees

C. 90.00 degrees

D. 37.49 degrees

Question 9 

Find the hypotenuse of a right triangle with one side equal to 33 feet and another side equal to 41 feet.

A. 8.60 feet

B. 38.83 feet

C. 52.63 feet

D. 74.00 feet

Question 10 

Horizontal angles can be measured with:

A. an automatic level.

B. a transit.

C. an EDM.

D. a steel tape.

Question 11 

A circle with a radius equal to 60 feet has a total number of degrees equal to __________.

A. 180

B. 360

C. 90

D. 380

Question 12 

A theodolite or transit can be used for the following functions except:

A. measuring a horizontal angle.

B. installing an offset point using a straight line.

C. measuring a vertical angle.

D. measuring a distance.

Question 13 

To ensure accuracy and precision, most angle measurements are done:

A. twice.

B. when it is very clear outside.

C. slowly.

D. between 90 and 180 degrees on the vernier scale.

Question 14 

When setting up a theodolite or total station, the tripod legs should:

A. be fully extended.

B. be firmly set once without further movement.

C. be slid up or down to center the level bubble.

D. never be used to level the instrument.

Question 15 

Total station set up over a control point is done:

A. very differently than transit set up.

B. for all uses of a total station.

C. following the same procedure as theodolite set up.

D. only when a control survey is being performed.

Question 16 

A total station instrument without a data logger is limited in functionality in regards to:

A. angle measurement.

B. coordinate layout.

C. data storage and coordinate calculation.

D. distance measurement.

Question 17 

The resultant measurements collected by a total station are typically processed into:

A. degrees, minutes, and seconds.
B. northing, easting, and elevation point coordinates.
C. degrees and feet.
D. topographic surveys.

Question 18 

Using a total station for construction surveying increases:

A. building costs.

B. layout efficiency.

C. project staffing requirements.

D. potential angle size use.

Question 19 

The total station equipped with a data logger can be used for all the following functions except:

A. downloading field measurements collected during a construction survey.

B. storing project control points for future field installation.

C. calculating coordinates for existing points where an angle and distance have been measured.

D. determining which control point should be used to gather the data necessary to layout a large facility.

Question 20 

When using a total station previously programmed with several project control points to conduct construction layout, it is necessary to:

A. set up on each previously programmed control point for angle verification.

B. sight at least two or three of the control points for angle verification.

C. backsight the control points that were initially installed by a theodolite.

D. backsight each of the previously installed control points for angle verification.

Question 21 

When a total station or transit with tape is being used for coordinate layout and a data logger or data collector is not available, coordinates can be installed or calculated if:

A. the construction surveyor understands the principals of trigonometry and right triangle fundamentals.

B. a licensed surveyor is doing the layout.

C. the surveyor is working on a level, horizontal surface.

D. the total station is an upgraded model capable of doing the coordinate calculations without the data collector.

Reference no: EM13679274

Questions Cloud

Compensation structure utilizing the hay plan method : Create the compensation structure utilizing the Hay Plan method and determination of Pay Levels using Microsoft Excel to include the benefit mix
Describe the elements of entrepreneurship : Describe the elements of entrepreneurship.
How do compare ethical leadership with buber : How do compare ethical leadership with Buber's I-Thou relationship theory? The ethical leader moves and acts in a world of I-thou relationships where in any situation
The implications of an article are presented : The implications of an article are presented in terms of research
Find the hypotenuse of a right triangle : When a total station or transit with tape is being used for coordinate layout and a data logger or data collector is not available, coordinates can be installed or calculate total station previously programmed with several project control points to..
Critique your employer method : Critique your employer method
Not possible to motivate an individual : Some people say it is not possible to motivate an individual.
Creating a motivational environment or a scenario : Creating a motivational environment or a scenario
The most challenge to the professional researchers : 1. What measurement scales are used in the sample questions provided (Exhibit OL-3)? Why might the lottery attitude and lottery importance questions have presented the most challenge to the professional researchers?

Reviews

Write a Review

Other Subject Questions & Answers

  Cross-cultural opportunities and conflicts in canada

Short Paper on Cross-cultural Opportunities and Conflicts in Canada.

  Sociology theory questions

Sociology are very fundamental in nature. Role strain and role constraint speak about the duties and responsibilities of the roles of people in society or in a group. A short theory about Darwin and Moths is also answered.

  A book review on unfaithful angels

This review will help the reader understand the social work profession through different concepts giving the glimpse of why the social work profession might have drifted away from its original purpose of serving the poor.

  Disorder paper: schizophrenia

Schizophrenia does not really have just one single cause. It is a possibility that this disorder could be inherited but not all doctors are sure.

  Individual assignment: two models handout and rubric

Individual Assignment : Two Models Handout and Rubric,    This paper will allow you to understand and evaluate two vastly different organizational models and to effectively communicate their differences.

  Developing strategic intent for toyota

The following report includes the description about the organization, its strategies, industry analysis in which it operates and its position in the industry.

  Gasoline powered passenger vehicles

In this study, we examine how gasoline price volatility and income of the consumers impacts consumer's demand for gasoline.

  An aspect of poverty in canada

Economics thesis undergrad 4th year paper to write. it should be about 22 pages in length, literature review, economic analysis and then data or cost benefit analysis.

  Ngn customer satisfaction qos indicator for 3g services

The paper aims to highlight the global trends in countries and regions where 3G has already been introduced and propose an implementation plan to the telecom operators of developing countries.

  Prepare a power point presentation

Prepare the power point presentation for the case: Santa Fe Independent School District

  Information literacy is important in this environment

Information literacy is critically important in this contemporary environment

  Associative property of multiplication

Write a definition for associative property of multiplication.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd