Reservoir A (water surface elevation = 1300 ft) is connected to reservoir B (water surface elevation=250 ft) by 6,000 ft of 14 inch diameter cast iron pipe (e = 0.005 ft. Neglecting all minor losses, estimate the discharge rate of the pipeline. Note, v= 12.17 x 10-6 ft2/s

Reference no: EM13535617

Questions Cloud

Calculate the minimum required cross-sectional area : The moduli of elasticity of plain concrete and steal are 25 GPa and 207GPa respectively, and the corss-sectionial area of steel is 2% of that of the reinforced concrete.
Calculate the detention time in hours horizontal velocity : Two rectangular clarifiers(sedimentation basins), each 30 ft long, 15 ft wide, and 10ft deep, settle a combinedtotal of 0.40 mgd following alum coagulation. The effluent channelshave a total weir length of 60ft in each basin
The angle theta which the 6-lb. uniform rod makes with the v : A 5-lb force is applied to the center of the roller at A, causing the assembly to roll. If the roller has negligible mass, determine (a) the angle theta which the 6-lb. uniform rod makes with the vertical during the roll, and
Select the beam dimensions and reinforcement for a balanced : A rectangular concrete beam has f'c=3000 psi and steel with fy=40ksi. Select the beam dimensions and reinforcement for a balanced section if the beam sustains a moment as a result of dead load of 60 kip-ft and a moment as a result of live load of 90 ..
Estimate the discharge rate of the pipeline : Reservoir A (water surface elevation = 1300 ft) is connected to reservoir B (water surface elevation=250 ft) by 6,000 ft of 14 inch diameter cast iron pipe (e = 0.005 ft. Neglecting all minor losses
Include a sketch of each cross-section drawn to scale : Problem Statement: A singly reinforced rectangular beam is to be designed, with effective depth approximately 1.5 times the width, to carry a service live load of 2000 lb/ft in addition to its own weight, on a 24 ft simple span. The ACI Code load fac..
Design the shear reinforcement : Problem Statement: A rectangular beam having b = 10 in. and d = 17.5 in. spans 15 ft face to face of simple supports. It is reinforced for flexure with three
Identify the contaminants on site and explain : Identify the contaminants on site and explain their hazards in relation to the proposed design and its construction. Describe the ‘In-situ’ and Ex-situ’ treatments that could be used and their relative merits
Briefly outline with the use of neat labelled sketches : It is proposed to make a new pedestrian access running directly south from University Square to Silvertown. The physical barriers that need to be overcome are the Royal Docks and the City Airport runway.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Specify the radius in mm to the centerline of a bend

Specify the radius in mm to the centerline of a 90 degree bend in a 1 in type k copper tube to acheive the minimum energy loss. For such a bend carrying 250 L/min of water at 80'C, compute the energy loss.

  Calculate what is the volume of rock in the rock pile

A storage pile of crushed rock is 100ft by 100ft square at its base and 50 ft by 50 ft square on the top. The pile is 25 ft high. What is the volume of rock in the rock pile

  Detyermine what is the percent voids in the total mix

An asphalt concrete mixture includes 94% aggregate by weight. The specific gravities of aggregate and asphalt are 2.65 and 1.0, respectively. If the bulk density of themix is 147 pcf, what is the percent voids in the total mix

  Design an earthen channel section into sandy soil

An earthen channel will be excavated into sandy soil for which Vmax = 4.0 ft/sec, n = 0.022, and the recommended m = 3. The channel will have a bottom slope of 0.0011 and accommodate a design flow of 303 cfs. Design (size) the channel section.

  Does our non-destructive test have the required sensitivity

To be sure that the part does not fail, we plan to ensure that the maximum applied stress is only one third of the tensile strength. We use a non-destructive test that will detect any internal flaws greater than 1.25 mm long.

  Determine the activated sludge aeration volume required

Determine the activated sludge aeration volume required to treat 2.64 mgd with a BOD of 120 mg/l based on the criteria of a maximum BOD loading of 40 lb/1000 ft cubed/day and a minimum aeration period of 5 hr.

  Plot of log-log grah of the flowrate as a funciton of h

Water flows from a large open tank through a sharp edged entrance and into a galvanized iron pipe of a length 1.5 miles and diameter of 4 inches. The water exits the pipe as a free jet at a distance

  Find expected value of number of days the car encounters

A particularly long traffic light at an intersection is green 20% of the time. A car approaches this intersection once each day. Let X represent the number of days the car encounters a green light.

  Define flow at a hydraulic jump in terms of flow

Define flow at a hydraulic jump (upstream and downstream) in terms of the types of flow and corresponding Froude number. What is the depth of water at each section (upstream and downstream) compared to critical depth

  Determine final temperature of helium in quasistatic process

7 g helium at 50 kPa and 200 K (ideal gas, M = 4, k = 5/3) are compressed polytropically in a quasistatic process with pv1.8 to 600 kPa. find the final temperature of helium. find the work and heat interactions

  Compare the reactor volume required to achieve efficiency

Compare the reactor volume required to achieve 95% efficiency for Completely Mixed Flow Reactor (CMFR) and a Plug Flow Reactor (PFR) for the following conditions. steady-state, first-order reaction, flow rate = 14m3 / day.

  Find what size pipe should be used to be riveted steel

The pressure at the entrance of the system must be at least 75 psi and the demand is 1350 GPM. The pipe material is to be riveted steel and the length of pipe is 5,000 feet. What size pipe should be used

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd