+1-415-670-9189
info@expertsmind.com
Devise a vertical alignment to connect the tunnel and bridge
Course:- Civil Engineering
Reference No.:- EM13550377





Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Civil Engineering

An engineering mistake has resulted in the need to connect an already constructed tunnel and bridge with a vertical curve. The profile of the bridge and tunnel is given in the figure below. Devise a vertical alignment to connect the tunnel and bridge by determining the highest common design speed for the sag and crest (equal tangent) vertical curves needed. Assume that the final grade of the sag curve equals the initial grade of the crest curve. Compute stationing of PVC, PVI, and PVT curve points.




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Civil Engineering) Materials
A bridge has been constructed between the mainland and anisland. The total cost (excluding toll) to travel across thebridge is expressed as C=50+0.5V, where V is the number of
A pressure gage at elevation 4.8 m on the side of a storage tank containing oil reads 34.7 kPa.Another gage at elevation 2.2 m reads 57.5 kPa. Compute the specific weight, den
Assume the following equations for the total benefit and totalcost of a reservoir project as afunction of scale, Q, expressed asmillion gallons water delivered per day(MGD):
The cable will fail when subjected to a tension of 2 kN.Determine the largest vertical load P the frame will supportand calculate the internal normal force, shear force, and
A 10 storey building measures 20m x 40m in plan and has columnslocated on a grid 10m x 10m. The floor consists of a 250mm thick R/C slab with droppanels 3m x 3m x 200mm thick
The concentration of a pollutant along a quiescent water-containing tube is shown in Figure 4-23. The diffusion coefficient for this pollutant in water is equal to 10-5 cm2
Consider the air over a city to be a box 100km on a side that reaches up to an altitude of 1.0 km. The air is blowing into the box along one of its sides with a speed of 4 m
Given a reinforced concrete beam made with 3000psi concrete and grade 40 steel. The effective width is 12 inches, the beam depth is 24 inches and the reinforcement is 4#7 ba