Develop a cpm network for moore house contractors

Assignment Help Operation Management
Reference no: EM13922166

Moore Housing Contractors

Moore Housing Contractors is negotiating a deal with Countryside Realtors to build six houses in a new development. Countryside wants Moore Contractors to start in late winter or early spring when the weather begins to moderate and build through the summer into the fall. The summer months are a busy time for the realty company, and it believes it can sell the houses almost as soon as they are ready-sometimes before. The houses all have similar floor plans and are of approximately equal size; only the exteriors are noticeably different. The completion time is so critical for Countryside Realtors that it is insisting a project management network accompany the contractor''s bid for the job with an estimate of the completion time for a house. The realtor also needs to be able to plan its offerings and marketing for the summer. The realtor wants each house to be completed within 45 days after it is started. If a house is not completed within this time frame, the realtor wants to be able to charge the contractor a penalty. Mary and Sandy Moore, the president and vice president of Moore Housing Contractors, are concerned about the prospect of a penalty. They want to be confident they can meet the deadline for a house before entering into any agreement with a penalty involved. (If there is a reasonable likelihood they cannot finish a house within 45 days, they want to increase their bid to cover potential penalty charges.)

The Moores are experienced home builders, so it was not difficult for them to list the activities involved in building a house or to estimate activity times. However, they made their estimates conservatively and tended to increase their pessimistic estimates to compensate for the possibility of bad weather and variations in their workforce. Following is a list of the activities for building a house and the activity time estimates:

Time (days)

Activity Description Predecessor a m b
a Excavation, pour footers - 3 4 6
b Lay foundation a 2 3 5
c Frame and roof b 2 4 5
d Lay drain tiles b 1 2 4
e Sewer (floor) drains b 1 2 3
f Install insulation c 2 4 5
g Pour basement floor e 2 3 5
h Rough plumbing, pipes e 2 4 7
i Install windows f 1 3 4
j Rough electrical wiring f 1 2 4
k Install furnace, air conditioner c, g 3 5 8
l Exterior brickwork i 5 6 10
m Install plasterboard, mud, plaster j, h, k 6 8 12
n Roof shingles, flashing l 2 3 6
o Attach gutter, downspouts n 1 2 5
p Grading d, o 2 3 7
q Lay subflooring m 3 4 6
r Lay driveway, walks, landscape p 4 6 10
s Finish carpentry q 3 5 12
t Kitchen cabinetry, sink, and appliances q 2 4 8
u Bathroom cabinetry, fixtures q 2 3 6
v Painting (interior and exterior) t, u 4 6 10
w Finish wood floors, lay carpet v, s 2 5 8
x Final electrical, light fixtures v 1 3 4

1. Develop a CPM/PERT network for Moore House Contractors and determine the probability that the contractors can complete a house within 45 days. Does it appear that the Moores might need to increase their bid to compensate for potential penalties?

2. Indicate which project activities Moore Contractors should be particularly diligent to keep on schedule by making sure workers and materials are always available. Also indicate which activities the company might shift workers from as the need arises.

Verified Expert

Reference no: EM13922166

Questions Cloud

What are the potential causes of a projects failure : The Department of Defense (DOD) has a record of both successful projects and failed projects. Discuss when a project is, at any organization, considered successful and when it is considered a failure. What are the potential causes of a project's f..
Balance sheet-total liabilities and assets-equity : Jill's Wigs Inc. had the following balance sheet last year: Cash $800 Accounts payable $350 Accounts receivable $450 Accrued wages $150 Inventory $950 Notes payable $2,000 Net fixed assets $34,000 Mortgage $26,500 Common stock $3,200 Retained earning..
Problem regarding the computer networks assignment : Both the CSMA/CD with Token bus medium access control methods can be used in real time systems. Which one is better suited for real time applications? Explain.
Who need to be involve in decision to purchase an erp system : Who in the organization needs to be involved in designing and implementing MRP II? Who needs to be involved in the decision to purchase an ERP system? Who needs to be trained to use ERP?
Develop a cpm network for moore house contractors : Develop a CPM/PERT network for Moore House Contractors and determine the probability that the contractors can complete a house within 45 days. Does it appear that the Moores might need to increase their bid to compensate for potential penalties?
Explained one page essay on the history of computers : Explained one page essay on the history of computers. Please focus on computer generations only
What is equity value and debt value on a market value basis : Dinklage Corp. has 4 million shares of common stock outstanding. The current share price is $83, and the book value per share is $8. The company also has two bind issues outstanding. The first bond issue has a face value of $90 million, a coupon of 6..
Determine the fixed rate on the swap : Given interest rate options with notional principals of $10 million on an underlying 120-day LIBOR. The options have exercise rates of 6% and will expire in 30 days. What is the payoff on the call option if the LIBOR in 30 days is 7%, in 60 days is..
What emotions were the images intended to elicit : Considering all the primary visual sources, as well as the propaganda poems and speeches, how are Germans portrayed? What emotions were the images intended to elicit

Reviews

Write a Review

Operation Management Questions & Answers

  Which stage of the product life cycle would you place

Which stage of the product life cycle would you place smart phones in, and why would you so place them? Which stage of the product life cycle would you place DVD players in and why would you so place them?

  Assignment on mergers and acquisitions

Use the Internet to research a publicly traded company in the United States that has undergone a merger or acquisition within the last three (3) years. Take note of the circumstances surrounding the merger or acquisition.

  Formulate as an lp problem to maximize profit

Kings will net a profit of $250 on each bracelet, which is made with 2 rubies, 3 diamonds, and 4 emeralds, and $500 on each necklace, which includes 5 rubies, 7 diamonds, and 3 emeralds. Formulate as an LP problem to maximize profit?

  Ethichal issues impact organizations and operations

Ethical behaior is a corporate issue that affects the company's bottom line. How do ethichal issues impact organizations and operations? Include an example seen in the workplace, in the news, etc. that relates to real-life situations

  Three-period moving average

Weekly sales of copy paper at Cubicle Suppliers are in the table below. Forecast week 8 with a three-period moving average

  Analyze the characteristics of service quality

Demonstrate thoughtful consideration of the ideas and concepts that are presented in the course and provide new thoughts and insights relating directly to this topic. Your response should reflect scholarly writing and current APA standards. Be sur..

  Extraterritoriality

Extraterritoriality is:

  Describe the five phases of a project

Determine which project might be implemented and why (e.g. feasibility study, breakeven analysis, etc). Describe the five phases of a project

  Discuss how supply and demand would be affected

Discuss how supply and demand would be affected under each of the four degrees of competition (pure competition, monopolistic competition, oligopoly, and monopoly)

  What will be the economic order quantity

If Mercedes Benz realizes that its annual demand for 500SEL model is 50,000 and their cost of order preparations is $42,000.00 and the inventory carrying cost per car per year is $3,600.00. What will be the Economic Order Quantity.

  Magnificent attractions

A study by the National Park Service revealed that 51% of the vacationers going to the Rocky Mountain region visit Yellowstone Park, 39% visit the Grand Tetons and 34% visit both. What is the probability that a vacationer will visit at least one of t..

  Evaluation and feedback system

In a 360-degree evaluation and feedback system, __________ rate a person's skill and performance.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd