Determining the work breakdown structure

Assignment Help Operation Management
Reference no: EM131387241

VoIP Part 1 (Work Breakdown Structure)

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview

As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company's campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.Deliverable 1: Summary (MS Word or open source equivalent)1.     Write a one to two (1-2) page summary document in which you:a.    Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).b.    Define a work breakdown structure and describe the methodology behind constructing one.Deliverable 2: WBS (MS Project or open source equivalent)2.    Use Microsoft Project to create a WBS which:a.    Contains at least five (5) main tasks, one for each of the PMBOK® process areas.b.    Contains at least sixty (60) line items distributed in ten (10) or more work packages.c.    Contains Work Breakdown Structure Code for each task.d.    Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.Deliverable one (1) of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
  • Identify how project management improves the success of information technology projects.
  • Explain the relationship of the scope of a project to the work breakdown structure.
  • Use technology and information resources to research issues in IT project management.
  • Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Reference no: EM131387241

Importance of discussing the project objective

Write a one page analysis of the importance of discussing the project objective between team members to avoid conflicts, and how would you manage conflicts between team memb

Can a dc achieve economy in inbound

Can a DC achieve economy in inbound (suppliers-to-DC) and outbound (DC-to-stores)transportation as in Japan? Is it feasible to design a new 7-Eleven's own (verticallyintegra

Types of waste or damages that data errors can cause

1) Give three examples of business processes or operations that would benefit significantly from having detailed real-time or near real-time data and identify the benefits.

Demonstrate how staff and their respective productivity

This assignment has two objectives.  The first objective is to demonstrate how staff and their respective productivity can be monitored across HIM departments.  The second o

What is the malcolm baldrige award

What is the Malcolm Baldrige award? Explain its significance. Search the Internet for a company that has recently won this award. Why did this company receive the Ba

Years in an attempt to implement

An organization has struggled for over three years in an attempt to implement and use an ERP system. It has finally decided to scrap this system, at great cost, and convert

Terms of a contract in a country

How do you enforce the terms of a contract in a country that has an unstable government or where the laws contradict or at a minimum, do not support all the terms in your co

Decomposing the process model

1) Discuss how the analyst knows how to stop decomposing the process model into more and more levels of detail. 2) Explain the relationship between a DFD level 0 diagram and D

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd