Determine what design speed was used for the curve
Course:- Civil Engineering
Reference No.:- EM13298454





Assignment Help >> Civil Engineering

A horizontal curve was designed for a four-lane highway for adequate SSD. Lane widths are 12 feet, and the superelevation is 0.06 and was set assuming maximum fx. If the necessary sight distance required 52 feet of lateral clearance from the roadway centerline, what design speed was used for the curve?




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Civil Engineering) Materials
A local rental yard said that they will supply you the loader for $50.00 per hour plus $4.15 sales tax not including any operating costs. You need to analyze what it would c
The concrete cylinder 6 in x 12 in broke incompression at a load of 110000 lbs. Compute the crushing strength of concrete. Estimate the tensile strength and the modulus ofelas
A coast guard helicopter hovers between an island and a damaged sailboat. How would you calculate the direct distance between the helicopter and the sailboat?From the island,
A backsight reading of 2.56 was obtained with rod at A and a foresight reading of 7.45 was obtained with the rod at the trial point B. If B is located 37.00 feet from the c
The total flow at a wastewater-treatment plant is 600 m3 day-1. Two bio-logical aeration basins are used to remove BOD from the wastewater and are operated in parallel. They
determine the average shear stress developed by the friction force on the tires. Assume the rubber of the tires is flexible and each tire is filled with an air pressure of 3
Determine the forces that occur on the L5/S1 joint if a person has a bent posture with hips flexed at 65 Degrees with no load. The distance from Upper Body Center of Gravity t
A sample of undisturbed soil has a dry weight of 10 lb and volumen of 1 ft^3. If the specific gravity of the soil solids is 2.65, determine the void ratio and the porosity.