Raw primary sludge at a solids concentration of 3% is mixed with waste activated sludge at a solids concentration of 6,000 ppm. The flows are 20 and 25 gal/min, respectively. What is the resulting solids concentration? This mixture is next thickened to a solids concentration of 80,000mg/L solids. What are the quantities ( in gallons per minute)of the thickened sludge and thickener overflow (water) produced ? Assume perfect solids capture in the thickener.

Reference no: EM13323976

Questions Cloud

Diversity in the workplace : Diversity in the Workplace
What is the equation for the profit of each firm : If there are n firms in the industry, find expressions for the competitive equilibrium price and quantity. What is the equation for how much each firm produces? What is the equation for the profit of each firm? [Hint: Your answer should be 4 algebrai..
What will be the growth rate of earnings : What rate of return are investors expecting and What would be the rate of return - What will be the growth rate of earnings?
How long after you release the rock does this happen : Picture yourself in the castle of Helm's Deep from the Lord of the Rings. You are on top of the castle wall and are dropping rocks on assorted monsters that are 15.55 m below you. How long after you release the rock does this happen
Determine what are the quantities of the thickened sludge : Raw primary sludge at a solids concentration of 3% is mixed with waste activated sludge at a solids concentration of 6,000 ppm. The flows are 20 and 25 gal/min, respectively. What is the resulting solids concentration
Define what is the closest value to the normal boiling point : Consider a liquid with a vapor pressure of 200. torr at 20.0 oC and a vapor pressure of 400. torr at 50.0 oC. What is the closest value to the normal boiling point of this liquid. A. 357 oC B. 295 oC C. 22.0 oC D. 18.2 oC E. 83.8 oC
Determine that the plant willrequire an expansion in 2010 : Determine that the plant willrequire an expansion in 2010. The cost of this expansion willbe $15 million. Assuming the financing of the expansion willbe delayed accordingly, calculate the projected interest paymentsand the amount of projected inte..
Find the highest and lowest frequencies heard by a student : A physics professor demonstrates the Doppler effect by tying a 610 Hz sound generator to a 0.9 m long rope, What are the highest and lowest frequencies heard by a student
How many pounds of sulphur would be emitted from coal-fired : How many pounds of sulphur would be emitted from coal-fired power plants in the united states in 3 years. (each year. U.S electricity production in about 0.28 x 1012 watts, and coal has an energy content of about 30 x 106 J/kg

Reviews

Write a Review

Civil Engineering Questions & Answers

  What was students associated perception per reaction time

An engineering student is driving on a level roadway and sees a construction sign 500 ft ahead in the middle of the roadway. the student strikes the sign at a speed of 25 mi/h.

  Calculate the maximum shear and indicate in terms of x

a. Determine the shear and moment diagram. b. Calculate the maximum normal stress on the top of the beam, on the bottom of the beam and indicate in terms of x its location.

  List the series of steps involved in converting rural land

List the series of steps involved in converting rural land into development. You may refer to an example of local conditions in your reference jurisdiction or you may use a description of such steps that you find from other sources

  Create a matlab program and flowchart for temperatures

Create a MATLAB program and flowchart which will allow the user to input an unknown number of temperatures, each of which might be a temperature in Celsius, Fahrenheit, Kelvin, or Rankine, and will convert the user input temperature to each of the..

  Determine what percent removal efficiency may be expected

The current removal efficiency is 96% for an air flow rate through the separator equal to 18 m3/s. Due to a process change, the air flow rate is expected to increase to 22 m3/s.

  What is the true settling velocity for such a particle

An old occupational hygiene rule of thumb is that a 10 micrometer (micron) silica particle settles at a rare of 1 ft/min (0.5 cm/s). What is the true settling velocity for such a particle? The density of silica is 2600 kg/cubic meter (2.6 g/cubic ..

  Calculate for the ground distance of the angular coverage 60

If an aerial photograph is taken with this camera tilted angle­­A=35° at an altitude 5000ft., calculate for the ground distance of the angular coverage 60°.

  Find the diamensions b and a with balanced stress

A reinforced concrete beam d = 18 in , and n = 10. find the diamensions b and a , that will resist a bending movement of 60 kip,ft with balanced stress reinforcement if fc =1600 psi and fs = 20 ksi

  What is the maximum column load in kips that could be placed

What is the maximum column load in kips that could be placed on a 4-ft square temporary footing on a sand for which the standard resistance is about N=15 and the water table is at the surface A factor of safety of 2 is to be maintained against bea..

  Calculate the mass of ammonium added to 1 l of water

Ammonium (NH4+) is a weak acid with a pKa of 9.26. The dissociation is: NH+4 NH3 + H+. Calculate the mass of ammonium added to 1 L of water in order to obtain a pH of 4 at equilibrium.

  Commencement of fill placement

Determine the horizontal spacing of the vertical drains if the drains are installed in triangular grid to reach 90% of primary consolidation in 1.5 years after the commencement of fill placement.

  Determine what is the minimum do in the river

A stream is in equilibrium with atmospheric oxygen upstream of a waste outfall. The waste outfall creates a BODo of 20 mg/L in the stream. The k(BOD) is 0.4 /day and the k(o2) is 1.4 / day. The stream temperature is 15 degrees Celsius.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd